Laserfiche WebLink
REGULAR MEETING APRILI2, 2016 130 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above quotations <br />were referred to Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — 2016 TREE PLANTING PROJECT NO 116 031 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. Ms. Martin, Clerk of the Board, stated there were no quotes <br />received for the project. <br />OPENING OF QUOTATIONS — 2016 TREE AND STUMP REMOVAL PROJECT NO 116 <br />O16 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />K C TREE INC. <br />1320 Third Street <br />Osceola, IN 46561 <br />Quotation was submitted by Diane C7111r7174 <br />Item <br />No. <br />Description_Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Removal Tree, 4"-12" <br />1 <br />EACH <br />$350.00 <br />$ 350.00 <br />2 <br />Removal Free, 12"-24" <br />8 <br />EACH <br />$485.00 <br />$ 2,425.00 <br />3 <br />Removal Tree, 24"-36" <br />25 <br />EACH <br />$605.00 <br />$12,705.00 <br />4 <br />Removal Tree, 36"-80" <br />12 <br />EACH <br />$1,200.00 <br />$14,400.00 <br />5. <br />Removal, Stump <br />2 <br />EACH <br />$100.00 <br />$ 200.OD <br />Total Amount of Quote $30,080.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Relos and carried, the above quotation <br />was referred to Engineering for review and recommendation. <br />APPROVE LETTER OF RESPONSE — GREELEY AND HANSEN DIGESTER NO 2 <br />UPGRADE AND DIGESTER CLEANING PROJECT' <br />Mr. Gilot stated Greeley and Hansen prepared a very technical letter in response to each claim <br />placed on the city by Grand River Construction Co. regarding the Digester No. 2 Upgrade and <br />Digester Cleaning project. Ile noted the gist of the letter was to deny the claim and require the <br />contractor to meet the specifications. Mr. Gilot added there were multiple vendors Grand River <br />could have chosen from to meet the specifications. He recommended the Board approve to <br />forward the letter indicating Engineering has reviewed the claims and there is no basis for <br />compensation. Mr. Gilot noted the specifications called for the manufacturer to review the cover <br />prior to testing for leaks and how to address if leaks were found during testing. He noted this is a <br />large claim, but there is strong contract language to support the City. Mr. GilOt stated he <br />recommends the project engineer meet again to try to reach a settlement with guidance from the <br />Public Works Director. Upon a motion by Mr. Gilot, seconded by Mr. Relos and carried, the <br />Board approved the response letter to be sent to Grand River Construction Co. on behalf of the <br />City and the Public Works Director to give guidance of further action regarding the claim. <br />AWARD BID — THREE (3), MORE OR LESS, 2016 OR NEWER, TANDEM AXLE MULTI- <br />USE DUMP TRUCKS (SUBJECT TO STREET DEPARTMENT CAPITAL LEASE FUNDSI <br />Mr. Jeff Hudak, Central Services, advised the Board that on February 9, 2016, bids were <br />received and opened for the above referenced trucks. After reviewing dense bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Truck Centers, Inc. d/b/a Hill Truck Sales, 1011 W. Sample St., South Bend, Indiana, in the <br />amount of $215,975 each for the base bid plus all alternates for a total of $647,925, Therefore, <br />Ms. Maradik made a motion that the recommendation be accepted and the bid be awarded as <br />outlined above. Mr. Relos seconded the motion, which carried. <br />