My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04122016 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
04122016 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:45:54 PM
Creation date
4/27/2016 10:02:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />APRIL12,2016 129 <br />South Bend, IN 46613 <br />Quotation was submitted by John Foster <br />Item <br />No. <br />Descri tion <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Removal and replacement of <br />1 <br />10,000lb. Versymmetric type <br />1 <br />$4,899 <br />above ground hoist. <br />Removal and replacement of <br />2 <br />12,000 lb. heavy duty symmetric <br />1 <br />$7,900 <br />type above ground hoist. <br />Total Amount of Quote 1 $12,799.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Doran and carried, the above quotation <br />was referred to Central Services for review and recommendation. <br />OPENING OF QUOTATIONS — 2016 COLD MILLING — PROJECT NO. 116-030 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />WALSH & KELLY INC. <br />24358 State Road <br />South Bend, IN 46614 <br />Quotation was submitted by Dustin Hilary <br />Item <br />No. <br />Description <br />Unit Price <br />Unit <br />Quantity <br />Total Amount <br />1 <br />Cold Milling, Asphalt <br />$1.40 <br />SYS <br />S421000.00 <br />2 <br />Milling, PCCP <br />$2.75 <br />SYS <br />;15000 <br />$41,250.00 <br />Additional Cold Milling, <br />3 <br />Asphalt, <br />$1.00 <br />SYS <br />Greater than 2.5 in <br />Additional Cold Milling, <br />4 <br />PCCP, <br />$2.00 <br />SYS <br />Greater than 2.5 in <br />Total Amount of Quote <br />$83,250.00 <br />.I. L. MILLING, 1N U. <br />15262 Industrial Dr, <br />Schooleraft, MI 49087 <br />Quotation was submitted by Linda Schming <br />Item <br />Total <br />No. <br />Description <br />Unit Price <br />Unit <br />Quantity <br />Amount <br />1 <br />Cold Milling, Asphalt <br />$.79 <br />SYS <br />30,000 <br />$23,700.00 <br />2 <br />Milling, PCCP <br />$1.63 <br />SYS <br />15,000 <br />$24,450.00 <br />Additional Cold Milling, <br />$.79 <br />3 <br />Asphalt, <br />SYS <br />Greater than 2.5 in <br />Cold Milling, <br />$1.63 <br />4 <br />IAdditional <br />PCCP, <br />SYS <br />Greater than 2.5 in <br />Total Amount of Quote <br />$48,150.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.