My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:40:12 PM
Creation date
4/28/2026 2:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br /> <br />A1.04 Grand Trunk Road Railroad coordination <br /> <br /> A Engineer shall, <br /> <br />Add the following, <br /> <br />7. Submit updated Application form and revised plans for review <br /> and undertake plan revisions. <br />8. Obtain plan approval from GRR <br /> <br /> <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – <br />Lump Sum Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for <br />services of Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $ 85,396 ,additional hourly based and reimbursable amount based <br />on the following estimated distribution of compensation: <br />a. Study and Report Phase $N/A <br />b. Preliminary Design Phase $39,282 <br />c. Final Design Phase $23,816 <br />d. Bidding and Negotiating Phase $2,438 <br />e. Construction Phase $2,000 <br />f. Post-Construction Phase $N/A <br />g. Construction Monitoring Geotech Services $200/ Hour for Prof. Engr <br /> Not to Exceed (NTE) $10,900 <br /> <br />h. Settlement Monitoring Plans $1,070 <br />i. Settlement Monitoring Field Services $180/ Hour for 2-man survey crew <br /> NTE $10,300 <br />j. Geotechnical Investigations/Reports $16,790
The URL can be used to link to this page
Your browser does not support the video tag.