My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:40:12 PM
Creation date
4/28/2026 2:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />k. Reimbursables (Mileage@0.725/mi) $3,090 $4,000 <br />l. (Fees-Permits, Right of Entry, Insurance, <br />Orientation, Flagging, Training, <br />Full-Board, etc.) Paid Receipts <br />m. Post-Final Design Phase NTE $11,990 <br /> <br /> Amendment 2 Summary (Reference only) <br /> <br /> 1. Construction Monitoring Services NTE $10,900 <br /> 2. Settlement Monitoring Field Services NTE $10,300 <br /> 3. Reimbursables $4,000 <br /> 4. Post-Final Design Phase NTE $11,990 <br /> <br /> Amendment 2 Total NTE $37,190 <br /> <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum and/or Not to Exceed amount unless approved in writing by the Owner. <br />3. The Lump Sum and/or Not to Exceed includes compensation for Engineer’s services and <br />services of Engineer’s Consultants, if any. Appropriate amounts have been incorporated in <br />the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses and Not <br />to Exceed to account for labor, overhead and profit. <br /> <br />Appendix 2 to Exhibit C <br /> <br />B. Schedule <br />Hourly rates for Office design and field services performed on or after the date of <br />Agreement are: as a result of unforeseen field conditions causing delays and/or rework, <br /> <br /> Billing Class VIII /Sr PM Geotech, PE $ 200.00 250.00/hour <br /> Billing Class VII / PM, PE $ 150.00 180.00/hour <br /> Billing Class VI / Sr. Project Engr Geotech $ 140.00 210.00/hour <br /> Billing Class V / Sr. Engr, Surveyor, PS $ 125.00 150.00/hour <br /> Billing Class IV / Surveyor, Engineer $ 115.00140.00/hour <br /> Billing Class III / Sr. Technician $ 105.00 130.00/hour <br /> Billing Class II / One Person Crew $ 135.00 180.00/hour <br /> Billing Class I / Two Person Crew $ 180.00 220.00/hour <br /> Support Staff / Admin $ 80.00 95.00/hour
The URL can be used to link to this page
Your browser does not support the video tag.