My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA - Greenlawn Water Main Replacement Proj No 122-041 A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 2:40:12 PM
Creation date
4/28/2026 2:40:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/28/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. ___2__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />June 14, 2022 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend, IN <br /> <br />c. <br /> <br />Engineer: <br /> <br />A&Z Engineering, LLC <br /> <br />d. <br /> <br />Project: <br /> <br />Grand Trunk Watermain Replacements at Greenlawn Avenue and S. 30th <br />Street Crossings/ SB Project # 122-041 <br /> <br />2. Description of Modifications: Modifications reflect revisions to previously reviewed plans <br />by G&T Western Railroad (GRR) for Watermain Replacements at Greenlawn Avenue. <br />Modifications include changing the size of the casing and carrier pipes, incorporating <br />ChoiceLight utility conduit in the plans, resubmitting permit applications, coordination <br />between Owner, Contractor, ChoiceLight and other utilities and GRR, undertake GRR <br />review compliance and construction support and coordination according to Canadian <br />National Utility Crossing/Encroachment Application Packet for Greenlawn Avenue. <br /> <br />EXHIBIT A <br /> <br />The Scope of Services authorized to be performed by Engineer in accordance with the <br />Agreement, previous amendment number 1, is modified as follows: <br /> <br /> <br />PART 1 – BASIC SERVICES <br /> <br /> A1.03a Post-Final Design Phase (100% Plans without Bidding Documents) <br /> <br />A. Engineer shall, <br /> <br />1. Revise the 100% plans to include, <br />a. Casing and carrier pipe size revisions and details <br />2. Coordinate with Owner, Utilities, Contractor and Field Monitoring <br />Team <br />3. Submit revised plans to Owner for review comments <br />4. Discuss review comments and compliance. <br />5. Provide construction support and coordination <br />
The URL can be used to link to this page
Your browser does not support the video tag.