<br />PRICE AND PAYMENT PROCEDURES
<br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 8
<br />23. Item 23: Pavement Striping, Thermoplastic, 6-inch Solid White, Crosswalk
<br />a. Description: This work shall consist of all labor, equipment, and materials
<br />necessary to complete installation of pavement striping including cleaning and
<br />preparation of pavement surface, applying primer (if required), heating
<br />thermoplastic, installing markings, forming edges and transitions, protecting
<br />markings until set, and all appurtenances.
<br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured
<br />on a lineal foot (LF) basis, complete in place.
<br />
<br />24. Item 24: Pavement Striping, Thermoplastic, 24-inch Solid White, Stop Bar
<br />a. Description: This work shall consist of all labor, equipment, and materials
<br />necessary to complete installation of pavement striping including cleaning and
<br />preparation of pavement surface, applying primer (if required), heating
<br />thermoplastic, installing markings, forming edges and transitions, protecting
<br />markings until set, and all appurtenances.
<br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured
<br />on a lineal foot (LF) basis, complete in place.
<br />
<br />25. Item 25: Pavement Striping, Thermoplastic, 4-inch Solid White
<br />a. Description: This work shall consist of all labor, equipment, and materials
<br />necessary to complete installation of pavement striping including cleaning and
<br />preparation of pavement surface, applying primer (if required), heating
<br />thermoplastic, installing markings, forming edges and transitions, protecting
<br />markings until set, and all appurtenances.
<br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured
<br />on a lineal foot (LF) basis, complete in place.
<br />
<br />26. Item 26: Pavement Striping, Thermoplastic, 4-inch Solid Yellow
<br />a. Description: This work shall consist of all labor, equipment, and materials
<br />necessary to complete installation of pavement striping including cleaning and
<br />preparation of pavement surface, applying primer (if required), heating
<br />thermoplastic, installing markings, forming edges and transitions, protecting
<br />markings until set, and all appurtenances.
<br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured
<br />on a lineal foot (LF) basis, complete in place.
<br />
<br />27. Item 27: Green Paint, Bike Lane
<br />a. This work shall include all labor, equipment, and materials necessary to complete
<br />installation of pavement paint including cleaning and preparation of pavement
<br />surface, masking, mixing, and applying paint, protection during curing time, waste
<br />disposal, protection of adjacent surfaces, and all appurtenances
<br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured
<br />on a square foot (SFT) basis, complete in place.
<br />
<br />28. Item 28: Pavement Striping, Thermoplastic Arrow, White
<br />a. Description: This work shall consist of all labor, equipment, and materials
<br />necessary to complete installation of pavement striping including cleaning and
<br />preparation of pavement surface, applying primer (if required), heating
<br />thermoplastic, installing markings, forming edges and transitions, protecting
<br />markings until set, and all appurtenances.
<br />b. Basis of Payment: Per each (EA), complete in place.
|