Laserfiche WebLink
<br />PRICE AND PAYMENT PROCEDURES <br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 8 <br />23. Item 23: Pavement Striping, Thermoplastic, 6-inch Solid White, Crosswalk <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of pavement striping including cleaning and <br />preparation of pavement surface, applying primer (if required), heating <br />thermoplastic, installing markings, forming edges and transitions, protecting <br />markings until set, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured <br />on a lineal foot (LF) basis, complete in place. <br /> <br />24. Item 24: Pavement Striping, Thermoplastic, 24-inch Solid White, Stop Bar <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of pavement striping including cleaning and <br />preparation of pavement surface, applying primer (if required), heating <br />thermoplastic, installing markings, forming edges and transitions, protecting <br />markings until set, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured <br />on a lineal foot (LF) basis, complete in place. <br /> <br />25. Item 25: Pavement Striping, Thermoplastic, 4-inch Solid White <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of pavement striping including cleaning and <br />preparation of pavement surface, applying primer (if required), heating <br />thermoplastic, installing markings, forming edges and transitions, protecting <br />markings until set, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured <br />on a lineal foot (LF) basis, complete in place. <br /> <br />26. Item 26: Pavement Striping, Thermoplastic, 4-inch Solid Yellow <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of pavement striping including cleaning and <br />preparation of pavement surface, applying primer (if required), heating <br />thermoplastic, installing markings, forming edges and transitions, protecting <br />markings until set, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured <br />on a lineal foot (LF) basis, complete in place. <br /> <br />27. Item 27: Green Paint, Bike Lane <br />a. This work shall include all labor, equipment, and materials necessary to complete <br />installation of pavement paint including cleaning and preparation of pavement <br />surface, masking, mixing, and applying paint, protection during curing time, waste <br />disposal, protection of adjacent surfaces, and all appurtenances <br />b. Basis of Payment: The acceptable quantities of pavement striping will be measured <br />on a square foot (SFT) basis, complete in place. <br /> <br />28. Item 28: Pavement Striping, Thermoplastic Arrow, White <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of pavement striping including cleaning and <br />preparation of pavement surface, applying primer (if required), heating <br />thermoplastic, installing markings, forming edges and transitions, protecting <br />markings until set, and all appurtenances. <br />b. Basis of Payment: Per each (EA), complete in place.