Laserfiche WebLink
<br />PRICE AND PAYMENT PROCEDURES <br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 7 <br />removal, disposal of existing pavement, and surface preparation for asphalt <br />replacement. <br />b. Basis of Payment: The acceptable quantities of asphalt pavement removal will be <br />measured on cubic yard (CYS) basis, complete in place. <br /> <br />17. Item 17: Curb Replacement <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete curb replacement including saw cutting existing pavement <br />and curb, excavation behind and beneath the curb, disposal of existing curb, <br />subgrade preparation, installing curb forms, concrete, expansion joints, dowels, <br />curing compound, and backfill. <br />b. Basis of Payment: The acceptable quantities of curb replacement will be measured <br />on a lineal foot (LF) basis, complete in place. <br /> <br />18. Item 18: HMA Asphalt, Surface <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete HMA asphalt surface including asphalt, surface cleaning <br />and preparation, placement, spreading, compaction, joints, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of HMA asphalt surface will be <br />measured on a ton basis, complete in place. <br /> <br />19. Item 19 <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete HMA asphalt intermediate including asphalt, surface <br />cleaning and preparation, placement, spreading, compaction, joints, and all <br />appurtenances. <br />b. Basis of Payment: The acceptable quantities of HMA asphalt intermediate will be <br />measured on a ton basis, complete in place. <br /> <br />20. Item 20: HMA Asphalt, Base <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete HMA asphalt base including asphalt, surface cleaning and <br />preparation, placement, spreading, compaction, joints, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of HMA asphalt base will be <br />measured on a ton basis, complete in place. <br /> <br />21. Item 21: HMA Asphalt for Tack Coat <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete HMA asphalt tack coat including heating, application, s <br />surface cleaning and preparation, placement, spreading, and all appurtenances. <br />b. Basis of Payment: The acceptable quantities of HMA asphalt tack coat will be <br />measured on square yard (SY) basis, complete in place. <br /> <br />22. Item 22: Aggregate Base, No. 53 <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete installation of aggregate base, no. 53 including aggregate, <br />preparation of subgrade, compaction, placing aggregate in uniform lifts, and all <br />appurtenances. <br />b. Basis of Payment: The acceptable quantities of aggregate base, no. 53 will be <br />measured on a ton basis, complete in place. <br />