Laserfiche WebLink
<br />PRICE AND PAYMENT PROCEDURES <br />2024.00254 Madison Lifestyle District Phase I Utility Design Water Main Replacement 012000 - 6 <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the installation of the valve and valve box including <br />excavation, bedding, backfill, valve, valve box, and valve key extensions (if <br />required). <br />b. Basis of Payment: Per each (EA), complete in place. <br /> <br />11. Item 11: 6-inch Pipe Abandon <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the abandonment of the existing water main and all other <br />appurtenances required. <br />b. Basis of Payment: The acceptable quantities of pipe will be measured on a per <br />linear foot (LF) basis. <br /> <br />12. Item 12: Valve Box, Removal <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the removal of a valve box on the abandoned water main <br />including necessary excavation, backfill, and restoration. <br />b. Basis of Payment: Per each (EA), complete in place. <br /> <br />13. Item 13: 6-inch Line Stop <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the installation of the line-stop valve to provide temporary <br />closure of the existing main, sleeve, necessary fittings, cap, temporary joint <br />restraint, necessary excavation, backfill, concrete thrust collars, excavation to <br />locate and expose the main, protection of existing utilities, disinfection, and <br />restoration. <br />b. Basis of Payment: Per each (EA), complete in place. <br /> <br />14. Item 14: 6-inch Ductile Iron Water Main, Restrained Joint <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the installation of the water main including excavation, <br />bedding, backfill, granular backfill, piping, fittings, joint restraint, connections to <br />existing water main, polywrap, testing, chlorination tap and abandonment, <br />disinfection, dechlorination, and all other appurtenances required <br />Basis of Payment: The acceptable quantities of water main will be measured on a <br />per linear foot (LF) basis, complete in place. <br /> <br />15. Item 15: 2-inch Service Line <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the installation of the water service including excavation, <br />bedding, and backfill, piping, fittings, coupling, service saddle, corporation stop, <br />reconnection to the existing water service, locator wire, testing, disinfection, <br />dichlorination, and all other appurtenances required. <br />b. Basis of Payment: The acceptable quantities of water service will be measured on a <br />per linear foot (LF) basis, complete in place. <br /> <br />16. Item 16: Asphalt Pavement Removal <br />a. Description: This work shall consist of all labor, equipment, and materials <br />necessary to complete the removal of existing pavement to facilitate installation of <br />the water main including saw cutting, pavement edge protection, milling, asphalt