Laserfiche WebLink
<br /> <br />O w n e r ’ s I n i t i a l s _________ <br />P a g e | 3 <br />Preserve Items <br /> <br /> All breakfast nook windows <br /> All appliances <br /> Fencing as needed <br /> <br /> <br />Excavation/ Concrete <br /> <br /> Demo wood ramp, concrete steps, sidewalk and drive as needed for <br />new crawl space foundations. <br /> Load and haul away debris. <br /> Layout and excavate for two crawlspace foundation additions. <br /> Load and haul away excess dirt. <br /> Form and pour foundations for two crawlspaces. <br /> Drill and pin new walls to existing using #4 rebar pins. <br /> Install l/2" x 8" galvanized anchor bolts every 6 linear feet. <br /> Backfill foundations using existing soils. <br /> Saw cut for two crawlspace accesses; demo and haul away debris. <br /> Pour and float finish two crawlspace floors at 2" thick with 6 mil <br />visqueen vapor barrier under slab. <br /> Bobcat/pump concrete into footings, foundations and floors as needed <br /> Form and pour approx. 25 linear feet of sidewalk. <br /> Form and pour two sets of steps at both back doors. <br /> <br />Please note that this proposal does not cover unforeseen obstacles below the soil in <br />your backyard. This could include utilities, underground lines, invisible fence systems, <br />sprinklers, etc. We can offer an additional utility locate service (at an additional cost) <br />which may be able to pick up some of these (additional to the standard and free 811 <br />service). <br /> <br />Framing – Subfloor <br /> <br />2x6 Treated sill plate bolted to foundation wall with foam sill seal between <br />surfaces. 2x floor joists to match existing of house, 16” on center attached to <br />sill. ¾” Tongue and groove OSB glued and power nailed to floor joists. <br /> <br />Floor heights of existing to new to be at same height. <br /> <br /> <br /> <br />