Laserfiche WebLink
<br /> <br />O w n e r ’ s I n i t i a l s _________ <br />P a g e | 2 <br />Main Level Interior <br /> Remove door and casing to half bathroom <br /> Remove wall section to make a wider bathroom door opening <br /> Remove flooring and base trims in half bathroom, kitchen and down <br />hallway; stopping at transitions to original ¾” flooring <br /> Remove subfloor to joists in half bath for access to plumbing and <br />HVAC crawlspace <br /> Remove toilet and pedestal sink in half bath <br /> Remove all wallpaper in project area only (kitchen, half bath, hallway) <br /> Remove all accessories in half bath <br /> Remove lighting throughout kitchen, hallway and half bath <br /> Remove portions of plaster ceiling for new lighting layout in kitchen <br /> Remove windows and trims at existing breakfast nook; preserve <br />windows for reinstallation at new breakfast nook location <br /> Remove built-in seating and table in kitchen <br /> Remove all kitchen cabinets and countertops <br /> Remove (4) cabinet doors in hallway; leaving cabinet box in place <br /> Remove kitchen sink and faucet <br /> Remove backsplash tile in kitchen <br /> Remove appliances; preserve all appliances for reinstallation <br /> <br />2nd Floor Hall Bathroom <br /> Remove toilet <br /> Remove sink and faucet <br /> Remove vanity cabinets and countertop <br /> Remove shower/tub wall surround, plumbing fixtures, bathtub and <br />curtain rod <br /> Remove floor tile to the subfloor and base trims <br /> Remove mirror and all other accessories <br /> Remove vanity light and soffit <br />o Soffit above bathtub and toilet to remain <br /> Remove flushmount light and vent <br /> Remove wall cabinet above toilet <br /> Remove all wallpaper <br /> Remove any damaged piping if needed at vanity as well as bathtub <br /> <br />See excavation list for additional items. <br /> <br /> <br />