My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Soffit Replacement Station 2 - Vera Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - Soffit Replacement Station 2 - Vera Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:12:45 PM
Creation date
6/24/2025 12:11:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />27453 County Road 150, Nappanee, Indiana 46550 + 574.773.3502 + ryoderconstruction.com <br /> <br />2 <br />c. All nail holes to be caulked with color matching caulk. <br />d. Touch up paint will be provided on an as-needed basis. <br />Division 26: Electrical <br />1. Extend the (5) electrical back boxes for the existing lights to be flush with new <br />soffit to allow for owner supplied and installed surface mount lights. <br />Section III: Proposal Clarifications/Exclusions <br />1. Proposal does not include: <br />a. Modifications to any adjacent finishes. <br />b. Painting other than listed above. <br />c. Electrical modifications other than listed above. <br />d. Sprinkler system. <br />e. Plumbing or HVAC. <br />f. Low voltage wiring. <br />Section IV: Base Cost <br />Based upon the above guidelines, RYC proposes a project cost of $27,685.00 <br />Section V: Payment Terms <br />Balance due upon completion. <br /> <br />This proposal is valid for 30 days from the date listed above. <br />Section VI: Approval to Proceed <br />The signing of this proposal authorizes R. Yoder Construction to move forward with the <br />above-mentioned project services at the proposed cost. <br /> <br />Accepted by: ____________________________________________________ <br />Printed Name: ___________________________________________________ <br />Date:__________________________________________________________ <br />RELY on R. Yoder <br />Erik Parcell <br />Project Manager <br />R. Yoder Construction, Inc.
The URL can be used to link to this page
Your browser does not support the video tag.