My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Soffit Replacement Station 2 - Vera Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - Soffit Replacement Station 2 - Vera Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:12:45 PM
Creation date
6/24/2025 12:11:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />27453 County Road 150, Nappanee, Indiana 46550 + 574.773.3502 + ryoderconstruction.com <br /> <br />1 <br />6/6/25 <br />South Bend Fire Station 2 <br />Soffit Replacement <br />402 Charles Martin Sr. Dr, South Bend, IN 46601 <br />Section I: Project Overview <br />R. Yoder Construction, Inc. (RYC) is pleased to deliver a proposal to replace approximately <br />1,930 SF of existing soffit on the wrap around porch. We will provide a unique customer- <br />oriented experience while delivering the exceptional quality and value we have been known <br />to provide since our inception in 1978. <br />Pricing is based on the 5/29 email from Todd S. and the 6/9 site walk with the owner. The <br />attached drawing and subsequent take-offs are a result of field measurements. <br />Section II: Proposal Scope of Work <br />Division 1: General Requirements <br />1. Assign Project Manager to the project <br />2. Provide daily and final clean up. <br />3. Removal of all construction debris. <br />4. Provide a (1) year workmanship warranty <br />5. Working hours of 7:00 am to 5:00 pm Monday through Friday <br />Division 2: Existing Conditions <br />1. Remove approximately 1,930 SF of existing soffit. <br />2. Remove (5) existing light fixtures and turn over to the owner. <br />3. Remove and reinstall (3) “attic vent” louvers. <br />4. Remove and reinstall (1) dryer vent cover. <br />5. Remove and reinstall (1) speaker. <br />Division 6: Wood <br />1. Modify existing porch soffit framing to accommodate (2) 30”x30” attic scuttle <br />holes. <br />a. Attic scuttles to be lay in panels that match the adjacent finish. <br />Division 7: Thermal & Moisture <br />1. Furnish and install new 4’x8’ LP Smartside Panel soffiting with batten strips. <br />a. Color: TBD by Owner from manufacturer’s standard prefinished <br />selections. <br />b. Batten strips to be laid out on site in an “appealing” manner.
The URL can be used to link to this page
Your browser does not support the video tag.