My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Soffit Replacement Station 2 - Vera Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - Soffit Replacement Station 2 - Vera Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:12:45 PM
Creation date
6/24/2025 12:11:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41'-0"100'-0"16'-0"21'-0"5'-0"21'-0"25'-0"18'-0"5'-0"40'-0"1,930.17 sfSBFS Station 2*ALL DIMENSIONS REQUIRE FIELD VERIFICATION*Remove all existing fiber cement soffit-Install new 4'x8' composite soffit material with battenstrips in an appealing pattern.-Supply and install all necessary labor and materials toaccommodate (2) new attic access hatches.-Attic access holes to be 30"x30" clear opening made ofsame material as adjacent soffit-Remove and reinstall (3) soffit vent/louvers-Remove and reinstall (1) dryer vent-Remove and reinstall (1) exterior speaker-Remove (5) recessed lights and extend boxes to be flushwith new soffit. City of South Bend to install new surfacemount lights.LegendDescriptionQuantityAttic Scuttle2Dryer Vent1Light5Louver/Vent3Speaker1Drawn By: ELP, 6.3.25
The URL can be used to link to this page
Your browser does not support the video tag.