Laserfiche WebLink
41'-0"100'-0"16'-0"21'-0"5'-0"21'-0"25'-0"18'-0"5'-0"40'-0"1,930.17 sfSBFS Station 2*ALL DIMENSIONS REQUIRE FIELD VERIFICATION*Remove all existing fiber cement soffit-Install new 4'x8' composite soffit material with battenstrips in an appealing pattern.-Supply and install all necessary labor and materials toaccommodate (2) new attic access hatches.-Attic access holes to be 30"x30" clear opening made ofsame material as adjacent soffit-Remove and reinstall (3) soffit vent/louvers-Remove and reinstall (1) dryer vent-Remove and reinstall (1) exterior speaker-Remove (5) recessed lights and extend boxes to be flushwith new soffit. City of South Bend to install new surfacemount lights.LegendDescriptionQuantityAttic Scuttle2Dryer Vent1Light5Louver/Vent3Speaker1Drawn By: ELP, 6.3.25