My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Soffit Replacement Station 2 - Vera Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Award Quotations & Proposals
>
Award Quote - Soffit Replacement Station 2 - Vera Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 12:12:45 PM
Creation date
6/24/2025 12:11:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Equipment <br />• Provide small tools and consumables for the project <br />• Rent scissor lift equipment for work at height <br />Management <br />• Project supervision provided <br />• Management oversight for the duration of work <br />Total $21,150.22 <br />Attachments <br />2025SherwinWilliamsColorBrochureCompressed_May2025.pdf <br />Sherwin-Williams Prefinished Snow White 5_16 x 4 x 8 Textured Allura No Groove Fiber Cement Panel <br />Siding.pdf <br />Sherwin-Williams Prefinished Snow White 5_16 x 4 x 8 Smooth Allura No Groove Fiber Cement Panel <br />Siding.pdf <br />Terms and Conditions <br />Signature <br />Carlos Vera <br />Carlos Vera <br />Vera Construction and Remodel Jun 5, 2025 <br />Todd Skwarcan / South Bend Fire Department Date <br />Client <br />Page 3/3
The URL can be used to link to this page
Your browser does not support the video tag.