Laserfiche WebLink
necessary to achieve compliance,the Building Commissioner is authorized to permit <br /> such construction, which shall be performed in accordance with all applicable laws and <br /> subject to regulation and enforcement by the Building Department. <br /> (c) Permit revocation. The Building Commissioner shall revoke a building permit when any of <br /> the following is applicable: <br /> (I) The application, plans or supporting documents contain a false statement or <br /> misrepresentation as to a material fact; <br /> (2) The application, plans or supporting documents reflect a lack of compliance with <br /> building standards and procedures; <br /> (3) There is a failure to comply with any provisions of state or local law; or <br /> (4) The structure for which the building permit has been issued is not being used or <br /> constructed in compliance with the Zoning Ordinance or any other ordinance relating <br /> to land use. <br /> (d) Where a building permit for a building or structure has been issued prior to the effective <br /> date of the ordinance from which this section is derived, and provided that construction <br /> begins within six(6) months of the effective date and is diligently performed to completion, <br /> that building or structure may be completed in accordance with the approved plans on the <br /> basis of which the building permit has been issued, and further, may, upon completion, be <br /> occupied under a certificate of occupancy for the use for which was originally designated, <br /> subject thereafter, if applicable, to the provisions herein for nonconforming buildings, <br /> structures, and uses. <br /> (e) Unless otherwise provided in the Building Code,the fees to be charged for the issuance of <br /> permits by the Department shall be paid at the time the permit is issued. <br /> (1) The fee for permits issued for residential and commercial new construction and <br /> building additions shall be based upon the following: <br /> a. Cost per Square Foot (CSF)times the total square footage(TSF) times the Local <br /> Variable Factor(LVF)of$0.00098, rounded down to the nearest whole dollar. <br /> b. Cost per square foot(CSF) shall be determined by the International Code Council <br /> Building Valuation Table in effect in January of each year. <br /> c. The cost per square foot(CSF) by occupancy classifications shall be amended as <br /> follows: <br /> I. Groups F-1, F-2, H-1, H-2, H-3, H-4, and M shall have the same rate as A-3. <br /> 2. Groups 1-4, R-2, and R-4 shall have the same rate as I-I. <br /> 3. Groups S-1, S-2, and U shall have the same rate as R-3. <br /> d. Minimum fee—Sixty dollars ($60.00). <br /> (2) Permits issued for all alterations, repairs, remodeling of existing structures over five <br /> hundred dollars($500.00), fence installations, swimming pool installations, <br /> communication towers, and utilities, as verified by the submitted documentation shall <br /> be subject to the following fee schedule: <br /> Estimated Construction Costs Permit Fees <br /> $1.00 to$3,000.00 $60.00 <br /> 3,001.00 to 4.000.00 65.00 <br /> 4,001.00 to 5,000.00 70.00 <br /> 5,001.00 to 6,000.00 75.00 <br /> 6.001.00 to 7.000.00 80.00 <br /> 7,001.00 to 8,000.00 85.00 <br /> 8,001.00 to 9,000.00 90.00 <br /> Page 4 of 42 <br />