My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:30 PM
Creation date
6/10/2025 12:01:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />April 17, 2025 <br />Page 6 <br />2024.00254 <br />2. Opinion of Probable Construction Cost (OPCC) at a Class 1 per American Association of Cost <br />Engineering (AACE) <br />3. Final Front End and Technical Specifications <br />4. IDEM Notice of Intent (NOI) to Construct a Water Main <br />V. Roadway Services <br />A. Maintenance of Traffic Design <br />American Structurepoint shall develop maintenance of traffic plans for 50%, 90%, and 100% <br />submittals as necessary for work associated with the water main extension and sanitary sewer lining <br />activities on W. Marion Street, N. Main Street, W. Madison Street, and N. Michigan Street. Design <br />shall be in accordance with the following anticipated water extension and sewer lining activities. <br />1. Sanitary Evaluation and Lining <br />a. No open cutting will be associated with the sanitary evaluation and lining. Work to occur <br />from manhole access points. Work can occur with traffic shifted away from access points <br />and will not require full road closure. <br />b. Maintaining through traffic is expected along Main St. from Marion St. to Lasalle Ave and <br />for the crossroads of Madison St. and Lasalle Ave. A road closure on Marion St. for <br />eastbound movements to Main St. is anticipated. <br />c. Maintaining through traffic is expected along Michigan St. from Marion St. to Lasalle Ave. <br />A road closure on Madison St. for eastbound movements from Michigan St. is anticipated. <br />d. A single phase maintenance of traffic plan is expected along Main Street while multiple <br />maintenance of traffic plan phases are anticipated along Michigan St. for each sanitary <br />line. <br />e. Pedestrian detours are anticipated at the intersections of Main St./Lasalle Ave and <br />Michigan St./Lasalle Ave. <br />2. Water Main Extension <br />a. Full intersection closures at Main St./Madison St. & Michigan St/Madison St. are <br />anticipated. Intersections are not required to be closed at the same time. <br />b. With intersection closure at Main St. and Michigan St., separate pedestrian detour routes <br />are anticipated. <br />c. With the intersection closure at Main St./Madison St. the City will allow detouring traffic <br />from a state route onto local a roadway. <br />American Structurepoint shall develop pedestrian maintenance of traffic plans for 50%, 90%, and <br />100% submittals as necessary for work associated with the pedestrian routes impacted by the water <br />main extension and sanitary sewer lining activities on W. Marion Street, N. Main Street, W. Madison <br />Street, and N. Michigan Street. <br />B. INDOT Permitting <br />1. The Consultant shall coordinate with the INDOT LaPorte District to obtain the necessary INDOT <br />road closure permit required for maintenance of traffic on SR933.
The URL can be used to link to this page
Your browser does not support the video tag.