My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:30 PM
Creation date
6/10/2025 12:01:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />April 17, 2025 <br />Page 7 <br />2024.00254 <br />a. The City of South Bend to complete and provide waivers for fee and bond requirements. <br />b. Any fees associated with INDOT permitting to be reimbursed by the City of South Bend. <br />C. Stakeholder Meetings <br />American Structurepoint shall, as needed, make arrangements for and attend meetings in <br />cooperation with the LPA, local officials, INDOT officials, planning agencies or commissions, and <br />civic organizations for appropriate project coordination with the local stakeholders and the <br />community. American Structurepoint will prepare meeting minutes and letter responses to <br />questions as needed. The following meetings are included in this scope. <br />1. Two (2) progress meetings with the City of South Bend <br />VI. Civil Engineering Services <br />American Structurepoint shall provide professional engineering services for the repair and replacement <br />of pavement for the approximately 450 lineal feet (LFT) of water main installation along Madison Street <br />from Main Street to Michigan Street. Professional services for pavement restoration design shall include <br />the following: <br />A. General <br />1. Pavement section will be based on existing City standard pavement sections or existing <br />pavement sections, whichever is greater. <br />2. No open cutting Is anticipated for sanitary sewer repairs and pavement restoration design is <br />limited to water main only. <br />B. Meetings <br />1. Virtual Kickoff Meeting <br />2. Virtual 50% Design review meeting with the City of South Bend <br />3. Virtual 90% Design review meeting with the City of South Bend <br />C. 50% Design Submittal to include the following: <br />1. 50% Design Drawings to include: <br />a. Pavement Demolition Plan <br />b. Pavement Replacement Site Plan <br />c. Grading Plan <br />d. Pavement Striping Plan (if necessary to replace existing striping) <br />e. Erosion Control Plan <br />f. Erosion Control Details <br />g. Construction Details necessary to construct the above items <br />2. Specification Table of Contents <br />D. 90% Design Submittal to include the following: <br />1. 90% Design Drawings to include: <br />a. Address any review comments received
The URL can be used to link to this page
Your browser does not support the video tag.