My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:30 PM
Creation date
6/10/2025 12:01:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />April 17, 2025 <br />Page 5 <br />2024.00254 <br />2. Opinion of Probable Construction Cost (OPCC) at a Class 1 per American Association of Cost <br />Engineering (AACE) <br />3. Final Front End and Technical Specifications <br />IV. Water Main Design <br />American Structurepoint shall provide professional engineering services for upsizing approximately 450 <br />lineal feet (LFT) of 6-inch water main to 12-inch water main along Madison Street from Main Street to <br />Michigan Street. Professional services for the water main design shall include the following: <br />A. General <br />1. Identify any variances from Indiana Administrative Code and the City of South Bend Standards. <br />B. Meetings <br />1. Virtual Kickoff Meeting <br />2. Virtual 50% Design review meeting with the City of South Bend <br />3. Virtual 90% Design review meeting with the City of South Bend <br />C. 50% Design Submittal to include the following: <br />1. 50% Design Drawings to include: <br />a. Title Sheet <br />b. Index Sheet <br />c. Control Points <br />d. General Notes <br />e. Water Main Plan and Profile <br />f. Water Main Standard Details <br />2. Opinion of Probable Construction Cost (OPCC) at a Class 3 per American Association of Cost <br />Engineering (AACE) <br />3. Specification Table of Contents <br />D. 90% Design Submittal to include the following: <br />1. 90% Design Drawings to include: <br />a. Address any review comments received <br />b. Maintenance of Traffic Plan <br />2. Opinion of Probable Construction Cost (OPCC) at a Class 2 per American Association of Cost <br />Engineering (AACE) <br />3. Draft Front Ends and Technical Specifications <br />4. Draft IDEM NOI to Construct a Water Main <br />E. 100% Design to include the following: <br />1. Signed and stamped Design Drawings
The URL can be used to link to this page
Your browser does not support the video tag.