My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:30 PM
Creation date
6/10/2025 12:01:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />April 17, 2025 <br />Page 8 <br />2024.00254 <br />b. Pavement Demolition Plan <br />c. Pavement Replacement Site Plan <br />d. Grading Plan <br />e. Pavement Striping Plan (if necessary to replace existing striping) <br />f. Erosion Control Plan <br />g. Erosion Control Details <br />h. Construction Details necessary to construct the above items <br />2. Draft Technical Specifications for associated scope <br />E. 100% Design to include the following: <br />1. Signed and stamped Design Drawings <br />2. Final Technical Specifications for associated scope <br />VII. Construction Phase Services <br />A. Attend in-person Pre-Bid Meetings for water main and sanitary sewer rehabilitation projects. <br />B. Respond to contractor questions during the bidding phase <br />C. Assist with Addenda preparation as required <br />D. Review and evaluation of water main and sanitary sewer rehabilitation bids <br />E. Shop drawing review: Receive and review up to twelve shop drawing submittals as required by the <br />Contract Documents. <br />F. Request For Information (RFI): Receive and review up to eight RFIs as they relate to the water main <br />and sanitary sewer work. <br />G. As-Built Submission: Compile and submit pdf as-builts using redline information provided by the <br />Contractor. Submit a shapefile compatible with GIS of the water main and sanitary sewer alignment. <br /> <br />Assumptions/Exclusions <br />A. Any identified utility relocation reimbursement will be paid for by the City of South Bend. <br />B. Construction coordination for utility relocation is not included. <br />C. City of South Bend will provide CCTV for sanitary sewer rehabilitation review. <br />D. Sanitary sewer rehabilitation plans will not require open cut nor profiles. <br />E. Sanitary sewer rehabilitation will not require an IDEM Sanitary Sewer Construction permit. <br />F. Phase 1 site development utility loadings to be provided by MEP Subconsultant. <br />G. The total disturbance area for water main upsizing and sanitary sewer rehabilitation will be under 1 acre and <br />a Construction Stormwater General Permit will not be required. <br />H. Location of Utilities by Potholing is not included. <br />I. Geotechnical Investigation is not required.
The URL can be used to link to this page
Your browser does not support the video tag.