My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 6 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:01:30 PM
Creation date
6/10/2025 12:01:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Zach Hurst <br />April 17, 2025 <br />Page 9 <br />2024.00254 <br />J. Environmental Assessment is not required. <br />K. Pressure testing and hydraulic modeling to determine water main sizing is not included. <br />L. Water quality modeling to determine impacts of upsizing the water main is not required. <br />M. Any cost estimating efforts after the contractor bidding occurs are not included. <br />N. Utility easement preparation is not included. <br />O. Any additional permits outside of the IDEM Notice of Intent to Construction a Water Main are not required. <br />P. Construction Inspection Services are not included. <br />Q. Construction Testing Services are not included. <br />R. Temporary Signal Design is not included. <br />S. Detour Route Design is not included. <br />T. Road and Roundabout Design and Plan Development is not included. <br />U. Traffic data collection, traffic analysis, and traffic signal design is not included. <br />V. Services resulting from changes of scope or magnitude of project as described above are not included. <br /> <br />Project Schedule <br />Water Main Design <br />Task Schedule <br />Topographic Survey 45 days from NTP <br />50% Design Submittal 45 days after receipt of topographic survey <br />90% Design Submittal 45 days after receipt of Owner and INDOT Review Comments <br />of the 50% Design Submittal. <br />100% Design Submittal 21 days after receipt of Owner and INDOT Review Comments <br />of the 90% Design Submittal. <br /> <br />Sanitary Sewer Rehabilitation <br />Task Schedule <br />Topographic Survey 45 days from NTP <br />CCTV Results and Review Meeting 30 days after receipt of CCTV footage <br />50% Design Submittal 45 days after receipt of Owner Review Comments from CCTV <br />Results and Review Meeting <br />90% Design Submittal 45 days after receipt of Owner and INDOT Review Comments <br />of the 50% Design Submittal. <br />100% Design Submittal 21 days after receipt of Owner and INDOT Review Comments <br />of the 90% Design Submittal.
The URL can be used to link to this page
Your browser does not support the video tag.