Mr. Zach Hurst <br />April 17, 2025 <br />Page 9 <br />2024.00254 <br />J. Environmental Assessment is not required. <br />K. Pressure testing and hydraulic modeling to determine water main sizing is not included. <br />L. Water quality modeling to determine impacts of upsizing the water main is not required. <br />M. Any cost estimating efforts after the contractor bidding occurs are not included. <br />N. Utility easement preparation is not included. <br />O. Any additional permits outside of the IDEM Notice of Intent to Construction a Water Main are not required. <br />P. Construction Inspection Services are not included. <br />Q. Construction Testing Services are not included. <br />R. Temporary Signal Design is not included. <br />S. Detour Route Design is not included. <br />T. Road and Roundabout Design and Plan Development is not included. <br />U. Traffic data collection, traffic analysis, and traffic signal design is not included. <br />V. Services resulting from changes of scope or magnitude of project as described above are not included. <br /> <br />Project Schedule <br />Water Main Design <br />Task Schedule <br />Topographic Survey 45 days from NTP <br />50% Design Submittal 45 days after receipt of topographic survey <br />90% Design Submittal 45 days after receipt of Owner and INDOT Review Comments <br />of the 50% Design Submittal. <br />100% Design Submittal 21 days after receipt of Owner and INDOT Review Comments <br />of the 90% Design Submittal. <br /> <br />Sanitary Sewer Rehabilitation <br />Task Schedule <br />Topographic Survey 45 days from NTP <br />CCTV Results and Review Meeting 30 days after receipt of CCTV footage <br />50% Design Submittal 45 days after receipt of Owner Review Comments from CCTV <br />Results and Review Meeting <br />90% Design Submittal 45 days after receipt of Owner and INDOT Review Comments <br />of the 50% Design Submittal. <br />100% Design Submittal 21 days after receipt of Owner and INDOT Review Comments <br />of the 90% Design Submittal.