Laserfiche WebLink
c. LIGHTING <br />1) Project Description and Understanding of Improvements <br />a) Provide design services related to the implementation of decorative street <br />lighting equipment along both sides of the proposed Marion Street <br />Pedestrian bridge over the St. Joseph River in South Bend, Indiana. <br />• It is assumed the project limits where proposed lighting facilities will <br />be required only include areas on the proposed pedestrian bridge <br />structure itself (approximately 400 lineal feet). Therefore, the <br />implementation of proposed lighting facilities along Marion Street, <br />Riverside Drive, or the East Bank Trail beyond the limits of the <br />proposed pedestrian bridge structure will not be required for this <br />project. <br />• It is assumed that decorative street lighting will be pedestrian scale <br />only and inset within proposed bridge railings. Therefore, <br />implementation of pedestrian pole assemblies atop or outside of the <br />proposed bridge structure will not be required. <br />• Temporary lighting plans are not included in this scope of work. <br />2) Decorative Street Lighting Design <br />a) Coordinate with the Owner to verify project goals, aesthetic lighting <br />preferences, and overall performance requirements for the proposed <br />lighting facilities. <br />b) Coordinate with the Owner’s preferred equipment vendor to verify <br />product information, specifications, and other construction related <br />requirements. <br />c) Coordinate with local power company to verify location of proposed <br />power source <br />d) Review existing topography survey base sheets. <br />e) Develop a lighting model utilizing Acuity Visual software to determine <br />proposed light levels within the project limits. <br />f) Prepare a Preliminary lighting plan submittal that reflects the installation <br />of new lighting infrastructure within the project limits listed in Task 1.a.1, <br />and then submit to Owner for review and comment. The Preliminary <br />lighting plans submittal would include the following: <br />• Lighting Index and General Note Sheet <br />• General plan sheet related elements including plan views; location of <br />existing utilities, service points, and lighting equipment; Right-of- <br />Way information; proposed conduit/wire type and locations; and all <br />proposed lighting elements. <br />• Provide preliminary project cost estimate related to the proposed <br />lighting improvements. <br />g) Perform project site visit to verify existing field conditions, as well as <br />placements of proposed equipment and service point. <br />h) Revise the Preliminary lighting plans based on initial review comments <br />received from Owner and/or changes recommended based on project site