Laserfiche WebLink
•Indiana Design Manual, <br />•INDOT Design Memoranda, <br />•INDOT Drainage Design Manual, <br />•INDOT Roadway Design Manual, <br />•Indiana Manual on Uniform Traffic Control Devices for Streets and <br />Highways (MUTCD), <br />•Where conflict exists between the City of South Bend Standards and <br />Specifications and those of the Indiana Department of Transportation, <br />the City of South Bend Standards and Specifications shall prevail, <br />unless otherwise directed. <br />2)Prepare (1) set of Final Check Plans and Opinion of Probable Construction <br />Cost for review by the Owner. <br />3)Upon approval of the Final Check Plans, the Engineer shall prepare Final <br />Contract Documents, including: <br />a)Final Tracing Prints submission, which will include: <br />•Construction details <br />•Right of way impacts, including access provisions to adjacent <br />properties <br />•Maintenance of traffic provisions <br />•Specifications <br />•Notice to bidders and Instruction to Bidders <br />•Special Provisions <br />•A statement of probable construction cost: The statement of probable <br />construction cost shall include all items of work required for the <br />complete construction of the work, including all temporary work <br />necessary in connection therewith, but shall not include the cost of <br />such items of work for which the Owner, through its own force or <br />through other party or parties, will prepare detail plans. The unit <br />prices to be used shall be in accordance with the methods used by the <br />Indiana Department of Transportation. <br />4)Base maintenance of traffic for the project on closing the roadway to through <br />traffic during construction. Local access to homes and businesses will be <br />maintained. Maintenance of traffic plans will be designed in accordance with <br />the Indiana Manual of Uniform Traffic Control Devices (IMUTCD). <br />5)Design sidewalks and multi-use paths to meet current ADA guidelines. <br />6)Prepare plans for new roadway signage and pavement markings in <br />accordance with the IMUTCD. <br />7)Prepare Erosion Control plans for the project. <br />8)Prepare details of non-standard roadway items to be included on detail sheets <br />with the project plans. <br />9)The design of this Project is on the basis that the project will be funded with <br />local funds. Design changes due to alternate funding, bridge alignment or <br />roadway/trail construction limit changes shall be considered Additional <br />Service.