Laserfiche WebLink
City of South Bend » Safe Routes to School » Construction Inspection <br />PROJECT APPROACH <br />Coordinating traffic flow necessary on local streets, <br />alleys and drives <br />PROJECT UNDERSTANDING <br />We have completed a recent site visit of the proposed project <br />location and also reviewed the most recent set of design <br />plans. In addition to the construction of 20 curb ramps <br />at various intersections near Kennedy Academy, this Safe <br />Routes to School project will also replace approximately 900 <br />feet of deteriorated or substandard sidewalk. <br />Existing alley approaches and residential driveways will be <br />reconstructed within the project limits to further provide <br />safe walking access throughout the corridor. A total of <br />29 residential drives and 21 alley approaches will be <br />reconstructed. Careful coordination with residents will be <br />necessary as access is temporarily impeded during the <br />course of construction. <br />5 <br />LEGEND <br /> Project Limits <br /> Sidewalk, Ramp and <br /> Drive Replacement <br />Linco <br />l <br />n <br />w <br />a <br />y <br /> <br />W <br />e <br />s <br />t <br />Goodland AvenueBertrand Street <br />Longley AvenueN. Johnson StreetN. Olive Street <br />Fremont Street