Laserfiche WebLink
4City of South Bend » Safe Routes to School » Construction Inspection <br />Since joining DLZ, Audrey has performed construction inspection on a variety of INDOT and Local Public Agency <br />projects. She has experience in the observation and documentation of various aspects of road construction including <br />asphalt pavement, concrete curb, sidewalk, as well as water main and storm sewer installation. <br />Relevant Experience <br /> »INDOT Contract R-44096, Plymouth Greenway Trail Phase <br />III, Plymouth, IN <br /> »INDOT Contract R-42712, Road Rehabilitation on US 24 <br />from 0.32 miles West of US 421 to 0.63 miles East of US <br />421, White County, IN <br /> »INDOT Contract B-42171, Bridge Widening on Cedar Street <br />over St. Joseph River, Mishawaka, IN <br /> »NICTD West Lake Corridor, Lake County, IN. Civil Inspector, <br />CM. The project includes an 8-mile expansion of the <br />existing South Shore Line and includes track, elevated <br />structures, bridges, retaining walls, and pedestrian <br />tunnels. <br /> »I-94 Concrete Pavement Restoration, Porter County, IN. <br />Civil Engineer I, Highway Dept. The project includes <br />concrete pavement restoration for approximately 5 miles <br />of I-94 with additional replacement of ten guardrails and <br />restriping of pavement markings. <br /> »US 31 Bridge Rehabilitation, Miami County, IN. Civil <br />Engineer I, Highway Dept. The project includes a rigid <br />deck overlay and railing replacement on US 31 over Old <br />US 24 & Norfolk Southern Railway, as well as replacement <br />of existing guardrails. <br /> »Culvert Cleaning within INDOT LaPorte District, Lake, <br />Newton, Jasper, White, and St. Joseph County, IN. Civil <br />Engineer I, Highway Dept. The project includes cleaning <br />culverts within various state routes, including SR 114, SR <br />16, SR 55, US 20, US 231, and US 41. <br />John is an experienced technician with 30 years in the construction industry. Observation experience includes performance of material <br />testing, monitoring daily construction activities and preparing Daily Work Reports for roadway reconstruction, bridge deck replacement <br />and telecommunication fiber installation projects. <br />Relevant Experience <br /> »INDOT On-Call, SR 331 over US 30 Bridge Deck Overlay, <br />Marshall County <br /> »INDOT On-Call, US 24 Bridge Bundle, Fulton County <br /> »INDOT On-Call, US 31 Reconstruction, St. Joseph County <br /> »INDOT On-call, SR 49 Bridge Bundle, Porter County <br /> »INDOT On-call, I-69 Bridge over Robinson Creek <br />Reconstruction, Fort Wayne <br /> »Coal Line Trail, St. Joseph County <br /> »Olive Street Reconstruction (2 phases), South Bend <br /> »Indiana Toll Road Concessions, ITS Phase II, <br />Lake, Elkhart, LaGrange & Steuben County <br /> »Handley Elementary Safe Routes to School, LaPorte <br /> »Bendix Drive Reconstruction, South Bend <br /> »Maplecrest Road Widening, Fort Wayne <br /> »Kercher Road Reconstruction, Goshen <br /> »LaPorte Street Footbridge Rehabilitation, Plymouth <br /> »Mishawaka Bridge over Yellow Creek, Elkhart <br />AUDREY STOOKSBURY, EI DLZ Inspector <br />JOHN BEER McCormick Inspector <br /> »2 Years Experience <br /> »33 Years Experience <br /> »BS Civil Engineering, Purdue University <br /> »Indiana Department of Transportation Certified Technician <br />KEY STAFF We all Hold the Keys to Safety <br />Safety is a core value at DLZ. As such, we are lucky <br />to have a full-time dedicated safety professional, <br />Phil Yrjanson, that works with our Indiana team. <br />Phil’s responsibility is to visit project sites and work <br />with our teams on injury and accident prevention. <br />He also leads our monthly targeted field safety <br />training. In recent months he or our staff have <br />noted several deficient items in the field and shared <br />those lessons learned with the entire staff in order <br />to raise awareness. Some examples include: <br />• Alerted a contractor that their workers were <br />performing hot welding while standing on a gas line <br />attached to a bridge. <br />• Noted several instances of inconsistent use of <br />PPE and emphasizing to wear the same PPE as <br />the worker performing the task or move to a safe <br />location outside the work zone. <br />• Alerted contractor to loose handrail that had an <br />insufficient nail pattern. <br />New ramps planned at Bertrand and Fremont