My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CED Annexation Policy Plan 1992
sbend
>
Public
>
Archived Plan Documents
>
CED Annexation Policy Plan 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 10:03:16 AM
Creation date
4/22/2025 10:02:09 AM
Metadata
Fields
Template:
Dept of Community Investment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Bureau of Streets derives its primary funding from user fees collected <br />by the State and then distributed to the various local public agencies, in <br />accordance with a published formula. This distribution is called the <br />Motor Vehicle Highway (MVH) fund. MVH funds are used for funding of <br />the local street department operations. Some Bureau of Streets funding <br />may be included in the general budget of the City, however, this inclusion <br />is usually specific funding for materials and not salaries. General <br />obligation bonds can be used for funding, although this is not considered <br />a normal funding source for Bureau of Streets operations. <br />Annexation can be expected to have a definite impact upon the Bureau of <br />Streets. Most activities of this bureau can be reduced to an <br />incidence -per -lane mile. Any annexation should be analyzed to <br />determine the number of lane miles of streets that are included, as well as <br />the condition of those streets. This information can be related to the lane <br />mile vs. performance of the existing staff to develop the impact upon the <br />basic staff size. Because of the formula method of distributing the MVH <br />fund, income should increase in proportion to the length of streets added <br />to the City street system. Use of private contractors as a supplement to <br />City personnel may be desirable during interim periods. It should be <br />recognized that the requirements for time -related work elements such as <br />snowplowing, street sweeping and patching will result in increased <br />equipment requirements. A pavement management program should be <br />developed to provide a planning base, budgeting information and <br />operational control. <br />4. Division of Water <br />a. Services Provided <br />The Bureau of Water (Water Department) is responsible for the planning <br />and construction of the City's water collection and distribution system. <br />This includes the development, operation and maintenance of well fields <br />and pumping stations, water reservoirs, water treatment facilities and the <br />installation of waster mains and fire hydrants. <br />The Bureau of Services is responsible for the maintenance of the <br />connections from the City water main to, but not in, the house or <br />building. The Bureau is also responsible for installation and maintenance <br />of meters. <br />The Customer Service Bureau deals with the customers from meter <br />reading through billings, collections and complaint response. <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.