Laserfiche WebLink
<br /> Page 2 <br />(Exhibit A – Engineer ’ s Ser vices) <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />4. Identify and evaluate [insert specific number or list here] alternate solutions available to <br />Owner and, after consultation with Owner, recommend to Owner those solutions which in <br />Engineer’s judgment meet Owner’s requirements for the Project. <br />5. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, and <br />related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[here list any such tasks or deliverables] <br />7. Furnish review copies of the Report and any other deliverables to Owner <br />within calendar days of the Effective Date and review it with Owner. <br />Within calendar days of receipt, Owner shall submit to Engineer any comments <br />regarding the Report and any other deliverables. <br />8. Revise the Report and any other deliverables in response to Owner’s comments, as <br />appropriate, and furnish copies of the revised Report and any other deliverables to the <br />Owner within calendar days of receipt of Owner’s comments. <br />B. Engineer’s services under the Study and Report Phase will be considered complete on the date when <br />the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners.