My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Central Fire Station Re-Roofing Proj No. R124-032A - Midland Engineeering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Central Fire Station Re-Roofing Proj No. R124-032A - Midland Engineeering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 1:33:28 PM
Creation date
11/26/2024 1:32:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. At parapet walls that have existing limestone coping caps, we will install polyisocyanurate <br />vertically on the walls to provide a smooth/flush transition up the wall. We will take the <br />PVC membrane up and over the existing limestone coping cap to make the walls water -tight. <br />NOTE: Currently WDI shows nothing on the walls and show NO termination bar <br />below the limestone overhang caps, which is not warrantable. Also, this will create a <br />small space for insects, bees, etc, to nest up under the metal coping cap. <br />5. Provide and install all necessary flashings at parapet walls, curbs, penetrations, roof drains, <br />etc. <br />6. We will provide and install new 24-gauge pre -finished steel (standard colors) shop fabricated <br />coping caps to go over the existing limestone coping caps to make water -tight. We will also <br />provide demo of existing metal components and provide new shop fabricated <br />counterflashings, roof edge fascia's, gutters and downspouts in the same locations as <br />currently installed. <br />7. Midland will be providing a 20-year manufacturer's (standard wind speed) system warranty <br />upon completion of this work. <br />8. On the existing paver/pedestal roof we will mark all pavers/pedestals and map out their <br />existing locations and take off roof to store temporarily. We will then provide new overlay <br />roof system as we are everywhere else. We will install new fabric filter overlayment mesh <br />over the PVC membrane and then re -install the pavers/pedestals to match the existing <br />layout. We will modify existing pavers as required to fit back into the original position. We <br />will adjust pedestals accordingly to accommodate the additional'/z" thickness we are adding <br />to the overallroof system, to ensure the "site lines" remain the same as what is currently in <br />place. <br />Inclusions <br />1. Dumpsters and temporary restroom facilities <br />2. Roof permit <br />3. Temporary restroom facilities for our employees while on -site <br />4. All hoisting of our material and equipment required for our work <br />5. Cleanup of all debris generated from our scope of work <br />6. $25,000.00 contract allowance for an unforeseen conditions/repair that may be required <br />7. Cost of 100% Payment/Performance Bond <br />8. 5% MBE and 5% WBE participation as a material supplier for this project <br />Exclusions <br />1. All snow/ice removal and winter conditions <br />2. 7% sales tax <br />3. Interior protection <br />4. No tapered insulation. The existing tapered insulation willremain in place. <br />5. Any costs associated with drain or drain parts replacement/repair. (if determined required) <br />
The URL can be used to link to this page
Your browser does not support the video tag.