My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Central Fire Station Re-Roofing Proj No. R124-032A - Midland Engineeering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Central Fire Station Re-Roofing Proj No. R124-032A - Midland Engineeering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 1:33:28 PM
Creation date
11/26/2024 1:32:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Any wood blocking repair/replacement. Blocking is assumed to be present at the perimeter <br />of the roof and in good condition underneath the existing metal edging and gutters. If any is <br />discovered we will provide and install this on a time and material basis ADD to our contract <br />amount. <br />7. Any costs associated with any wet insulation replacement. If any is discovered we will <br />provide on a time and material basis ADD to our contract amount. <br />Clarifications <br />1. Assume to have a small "lay -down" area near the bung, if necessary, for a small number of <br />materials, dumpsters, temporary restroom facility, forklift, etc. <br />Z. We assume we will be able to get up close and around the building with our truck crane to <br />load and download materials, equipment, etc. <br />3. This re -roof will produce noise and we assume to work during normal business hours of <br />(6am — 5pm). <br />4. Our roofing construction is bid to meet the manufacturer's 20-year (standard wind speed) <br />warranty requirements. Adjustments to the roofing system that may be required by the <br />owners' insurance would be an add to our contract amount. <br />5. Fall protection included in our bid is limited to the requirements of OSHA standard 29 CFR, <br />part 1926, subpart M. <br />6. All fastener colors are standard for both insulation and membrane. Any painted fasteners to <br />a specific color would be an upcharge. <br />7. Please take note that the above system will be PV Solar ready if owner decides down the road <br />to want to put solar up on the roof. Please note that if owner wants the PV Solar to be <br />included in the roof warranty that the PV Solar system would need to be designed by Sarnafil, <br />and would need to be installed within 5 years of the new roof being installed. The roof <br />would have to be inspected first to determine if the above is applicable. <br />Sarnafil Sikaplan 60 PVC Overlay <br />Contract Price: FIVE HUNDRED SIXTY-FOUR THOUSAND, SEVEN <br />HUNDRED DOLLARS ($564,700.00) <br />If you have any questions or concerns, please do not hesitate to call (574) 271-3805, extension <br />131. <br />Sincerely, <br />MIDLAND ENGINEERING COMPANY <br />L00000k�r <br />Landon Conrad <br />Estimator/Sales Representative <br />LC/kjt <br />Cenral Aire Station Reroofing (t 1-26-24)-p <br />TERMS <br />AND CONDITIONS: If the work <br />is completed within 30 days of its commencement, payment <br />in full is due upon <br />receipt of invoice. In ell other cases, payment <br />of 95 % <br />of the work completed shall be <br />tlue upon receipt of invoice covering partial billing with final <br />peVment due upon <br />receipt of invoice covering final billing. Non- <br />payment <br />in accordance with the above <br />shall be cause for terminating performance. If payments ere not <br />made when due, <br />interest, costs incidental to collection and at- <br />torneys <br />fees shell be added to the unpaid balance. Interest shell accrue at the rate of t '/, %per <br />month. Customer waives application of valuation and appraisement <br />laws. Not <br />liable for failure to pertorrn caused <br />by strikes, fire or anything beyond our control, puotations subject <br />to change without notice. Estimates limited to 15 days acceptance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.