Laserfiche WebLink
a.Pool Plans, Sections, and Details <br />b.Pool Structural Design <br />c.Preliminary Pool Piping Plans, and Piping Details <br />d.Pool Mechanical Plans, Schedules, and Details <br />5.Update Utility Requirements <br />6.Develop Draft Specifications <br />7.Conduct Inter-Disciplinary Review <br />8.Verify Aquatic Design for Code Compliance <br />9.Develop Preliminary Aquatic Construction Cost Opinion <br />Services for the 90% Design will include the following: <br />1.Finalize Pool Equipment and Mechanical Equipment Schedules <br />2.Finalize and Assemble Pool and Pool Mechanical Aquatic Drawings <br />a.Pool Plans, Sections, and Details <br />b.Pool Mechanical Plans, Schedules, and Details <br />c.Pool Piping Plans, Schedules and Details <br />d.Pool Structural Design <br />e.Pool Mechanical Schematics <br />3.Finalize Specifications <br />4.Finalize Utility Requirements <br />5.Finalize Coordination <br />6.Perform Internal Quality Assurance Procedure <br />7.Address Questions and Comments from Permitting Agencies <br />8.Assist with Swimming Pool permit applications for local jurisdiction. Owner is <br />responsible for completion, review, and submittal of final application(s). <br />D.The aquatics center building will be based on the conceptual floorplan developed in the <br />preliminary design phase plans and shown in EXHIBIT 3.