My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:03 PM
Creation date
8/13/2024 2:04:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a.Pool Plans, Sections, and Details <br />b.Pool Structural Design <br />c.Preliminary Pool Piping Plans, and Piping Details <br />d.Pool Mechanical Plans, Schedules, and Details <br />5.Update Utility Requirements <br />6.Develop Draft Specifications <br />7.Conduct Inter-Disciplinary Review <br />8.Verify Aquatic Design for Code Compliance <br />9.Develop Preliminary Aquatic Construction Cost Opinion <br />Services for the 90% Design will include the following: <br />1.Finalize Pool Equipment and Mechanical Equipment Schedules <br />2.Finalize and Assemble Pool and Pool Mechanical Aquatic Drawings <br />a.Pool Plans, Sections, and Details <br />b.Pool Mechanical Plans, Schedules, and Details <br />c.Pool Piping Plans, Schedules and Details <br />d.Pool Structural Design <br />e.Pool Mechanical Schematics <br />3.Finalize Specifications <br />4.Finalize Utility Requirements <br />5.Finalize Coordination <br />6.Perform Internal Quality Assurance Procedure <br />7.Address Questions and Comments from Permitting Agencies <br />8.Assist with Swimming Pool permit applications for local jurisdiction. Owner is <br />responsible for completion, review, and submittal of final application(s). <br />D.The aquatics center building will be based on the conceptual floorplan developed in the <br />preliminary design phase plans and shown in EXHIBIT 3.
The URL can be used to link to this page
Your browser does not support the video tag.