Laserfiche WebLink
E. The renovation of the existing restroom building will be based on the conceptual floorplan <br />developed in the preliminary design phase plans and shown in EXHIBIT 4. <br />F. The following assumptions have been made regarding the scope described herein: <br />1. The project will be designed in English units and in accordance with City of South <br />Bend Standards and Specifications and all applicable Local and State Codes. <br />2. Per the Preliminary Drainage Study, stormwater detention will be provided on-site <br />and will not utilize the existing underground storage facilities. <br />