My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:03 PM
Creation date
8/13/2024 2:04:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 1 <br />Project Description <br />A.The project components and design parameters outlined herein are based upon concepts <br />described in the following documents: <br />1.Professional Services Agreement, dated December 13, 2022, between the Board of <br />Public Works, City of South Bend, Indiana and DLZ Indiana, LLC for Kennedy Park <br />Improvements, Project No. 123-008. <br />2.Kennedy Park Improvements Preliminary Design Phase Plans, dated January 23, <br />2023. <br />3.Grant Application and supporting documents for the Outdoor Recreation Legacy <br />Partnership (ORLP) program grant. <br />4.Kennedy Park Improvements Preliminary Drainage Study, dated January 18, 2023 <br />5.The concepts in the above listed documents will be further developed in the <br />refinement of the project as described herein. <br />B.The project described herein builds upon the Kennedy Park Improvements Preliminary <br />Design Phase Plans which were developed to approximately 30% completion for the ORLP <br />grant application. The project will consist of final engineering services for improvements to <br />Kennedy Park bordered by Westmoor Street to the north; Olive Street, Kennedy Academy, <br />and Meade Street to the east; Bendix Drive to the south; Goodland Avenue to the west. Refer <br />to EXHIBIT 1 for the project limits and proposed preliminary design phase improvements. <br />Final engineering drawings will be developed for the new park improvements including an <br />outdoor aquatic center with building, a multi-site picnic area, a network of paths, renovation <br />of the existing restroom building, outdoor recreation areas, and a parking lot. The final <br />engineering drawings will also include stormwater management, water service, sanitary <br />sewer service, site lighting, electric service, gas service, and telecommunication service. This <br />Agreement is based on a $15M project construction cost. <br />C.The aquatics center will be based on the conceptual plan developed in the preliminary design <br />phase plans and shown in EXHIBIT 2. <br />Services for the 60% Design will include the following: <br />1.Finalize Pool Wall Profile(s) <br />a.Shapes and Depths <br />2.Define Pool Specialty and Mechanical Equipment <br />3.Develop Pool Mechanical Equipment Layout <br />4.Develop Aquatic Drawings
The URL can be used to link to this page
Your browser does not support the video tag.