iii. Remaining relocation of existing 10" RCP and 24" RCP has been included as <br />shown on the attached drawings with a direction connection to Junction <br />Chamber #1. <br />All ductile iron pipe will be C153 fittings and cement lined. <br />All duct bank concrete to be regular concrete with red shake on topper. <br />FINAL CLARIFIERS 1-3 REHABILITATION -PERIPHERAL FEED ALTERNATIVE — SCOPE OF WORK <br />The scope is based upon: <br />• Arcadis Final Clarifier 1-3 Drawings, dated October 2022 (35 Plan Sheets) <br />■ Arcadis Final Clarifier 1-3 Specifications (864 Pages) <br />■ Arcadis Final Clarifier 1-3 Addendum #1 (46 Pages) <br />• Earth Exploration Geo-tech for Final Clarifiers 1-3 PDF (3 Pages) <br />General <br />a. Bowen has not included costs for any contaminated/hazardous material handling and/or <br />disposal. <br />b. Bowen has not included any budgets for Right of Ways, Right of Entries, Easements, Temp <br />Easements. <br />c. No costs for permits or railroad monitoring are included in this scope. <br />d. All permits, including INDOT, are by others. <br />e. AIS domestic steel requirements have been followed; however BABA requirements are not <br />included. <br />f. Davis Bacon prevailing wages are included. <br />g. Construction Contingency: The Contractor's GMP Proposal contains, as part of the estimated <br />Cost of the Project, the Contractor's Contingency, a sum agreed upon to cover costs which <br />are properly reimbursable as a Cost of the Project, whether or not such cost is the basis for a <br />Change Order. The Contractor shall regularly (no less than on a monthly basis during the <br />term of this Agreement) provide the Owner with an accounting of all charges against the <br />Contractor's Contingency. <br />Final Clarifiers 1-3 Improvements <br />a. Our scope is based on the existing deep foundations providing adequate structural integrity <br />to maintain the existing final clarifiers in place without the use of dewatering. <br />b. Our scope is based on the existing structural concrete and deep foundations providing <br />adequate protection from the groundwater such that the work can be completed without <br />the use of dewatering efforts. <br />c. Includes Spall Repairs — 330 SF <br />d. Includes Crack Repairs — 290 LF <br />e. Includes Expansion Joint Repairs — 200 LF <br />f. Includes Anchor Repairs — 870 EA <br />g. Includes Railing Removal and Replacement —1600 LF <br />h. Includes Protective Slurry—14,000 SF <br />3. Peripheral Feed Specific Items <br />a. Scope is based on providing clarifier equipment per one of the following: <br />i. OVIVO Proposal 2-13-0360 REV 1B OPT 1— (Spiral Blade) <br />1. This option is currently carried in the GMAX pricing. <br />ii. OVIVO Proposal 2-13-0360 REV 1B OPT 2 —(Suction Header) <br />1. The Suction Header option is $50,000 less than the Spiral Blade option. <br />