Laserfiche WebLink
The existing plant flow shall remain as -is; such that: <br />L The existing influent gates shall remain and all work associated with the existing <br />Final Clarifier Influent Channel and Proposed new Influent Gates is excluded. <br />ii. All work associated with the 36" influent pipe including demolition and Auger Cast <br />piles is excluded. <br />iii. Approximately 20 LF of 6"x6" concrete curb has been added at each clarifier influent <br />channel where there is open grating. <br />