My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
07-26-12 Packet
>
6B (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:08:01 PM
Creation date
11/1/2012 10:40:39 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH BEND REDEVELOPMENT COMMISSION —IVY TOWER FACILITY RENOVATION PROMM' <br />Proposal for Environmental Services <br />In addition to our general qualifications, we believe that our experience on a number of specific <br />projects is relevant to the project. These projects include the following: <br />• AJW Distribution Center (South Bend, Indiana) — Weaver Boos was retained by the City <br />of South Bend to complete a Phase I and II ESA and preliminary Geotechnical <br />Exploration Program of a 90 -acre Brownfield (comprised of several land parcels owned <br />by seven separate entities) to meet the requirements of a potential developer (AJW South <br />Bend Realty Corporation, a subsidiary of the TJX Companies). During the project, we <br />worked closely with the several existing Site owners in addition to other entities involved <br />with the Project to meet the short time frame allowed for the completion of the project. <br />After AJW South Bend Realty Corporation agreed to purchase the Brownfield and <br />construct their proposed distribution center, Weaver Boos was retained by the City of <br />South Bend to provide monitoring oversight and additional services associated with the <br />redevelopment of the Brownfield. This oversight included the removal of several USTs, <br />hydraulic lifts, drywells, and impacted soil all in accordance with state regulations and <br />guidance. Weaver Boos has also been retained by both the City of South Bend and AJW <br />South Bend Realty Corporation, who recently completed construction of the distribution <br />center, to secure a Certificate of Completion (COC) from the VRP for the AJW Site. <br />VRP work is ongoing but will include all element of the VRP Program. <br />• Former Studebaker Stamping Plant, South Bend Lathe, and Underground Pipe and Valve <br />Demolitions (South Bend, Indiana) — Weaver Boos was retained by the City of South <br />Bend to complete environmental bid specifications and to provide environmental <br />oversight during the demolition of a multi - building complex that formerly was used for <br />automotive assembly and manufacturing. Additional tasks included the completion of a <br />geophysical survey, limited building material characterization, and comprehensive soil <br />and material sampling. <br />• Salvation Army Kroc Community Center (South Bend, Indiana) — Weaver Boos was <br />retained by the Salvation Army to provide environmental oversight services during the <br />redevelopment of a former park, once occupied by a gasoline filling station and several <br />dry cleaning facilities, into an athletic and recreational complex, Additional tasks <br />included the removal of several USTs and buried debris. <br />• Aldi Supermarkets (Illinois, Indiana, Michigan) —Weaver Boos is currently engaged in or <br />has completed site assessment and development services (including environmental <br />oversight during construction/demolition) allowing Aldi to develop new stores in Illinois, <br />Weaver Boat Cansulla ws, L C <br />South Hand, IN 46628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.