My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:22:47 PM
Creation date
8/28/2019 11:14:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o <br />Selge Constiuction South Bend GESC 2019 <br />Project #3 Title: <br />Villa e of Paw Paw SRF Projects <br />Project Owner_/Host: <br />Villa e of Paw Paw �_....... - - - - - - - -...... ..... <br />Sele e Scope of Work:...... <br />General Contactor ... ....................................... _ <br />mmmIT� _........ <br />Location <br />.__....._ .�..... _. <br />111 E. Michi Ave, Paw Paw, MI 49079 <br />Dollar Amount: <br />$1,653,721.00 <br />_...._. ___ <br />Source of Funds: <br />_-....._...........---__...... ._._... <br />Owner Funded ww....w....ww ............_ ...... <br />_mm.. _ _ <br />Type of Contract <br />Public Bid <br />Designer/Engineer <br />Abonmarche <br />Start/End dates <br />...- ...._ �........_....... <br />June 2016 — October 2018 <br />�_..a_...........�..........._���.�_���� ��..�� ........ <br />Prolected Annual Energy Savings: <br />—490,000 kWh's <br />Projected Annual OperatinSavms: <br />$182,000.00 <br />Contact Information 1: <br />Dan Dombos - Abonmarche (269) <br />......... <br />Contact Information 2: <br />mmSarah Moyer Cole -Paw Paw - (269) 657 3148w <br />w................... <br />tiona Addil Information: _ <br />Selge Construction was the General Contractor for this project <br />in 2017 working closely with Abonmarche and the <br />manufactures. The project was not a guaranteed energy savings <br />project but the owner was very happy with the overall energy <br />savings of the project. <br />Energy Savings are calculated off of historical data proving that <br />using Variable Frequency Drives (VFD's), Solid State Reduced <br />Voltage Starters (SSRVS), Programmable Logic Controllers <br />(PLC), SCADA, and energy efficient pumps, save <br />approximately $650 per Horsepower (HP) of pump replaced. <br />The savings is based on less energy consumption, better <br />controls, and less maintenance/repairs. This specific project <br />replaced and upaded 280 HPwofMpumps and controls. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.