Laserfiche WebLink
rON <br />UCTION <br />Selge Construction South Bend GESC 2019 <br />Project #2 Title: mmm <br />w <br />JPR Solar Patio �...... ................. <br />Project Owner Host: , � .... <br />ones PetrieRafinski <br />Sere She of Work:m mm mmm <br />General Contractor/Installermmmmm <br />Location; <br />w _ �.�.� ����.. <br />325 S Lafayette Blvd, South Bend, IN 46601 <br />._._.._..... ..........._............... ........_..._....... _ ........ <br />Dollar Amount: <br />—$150,000 <br />Source of Funds: <br />Self funded- <br />tr <br />T e of Contract: <br />r......................................_ ......_ .............. <br />Direct Purchase <br />chase <br />.....�-......... <br />Desi ner/En sneer: <br />........_........... .. . <br />............ <br />J PR,Mike Currier,574 232-411311818111— <br />act/End dates: <br />May 2019 -June 2019 <br />Projected Annual Enemy Savings: <br />14,500 KWH's <br />Projected Annual O eratin Savin s <br />$1,300 <br />Contact Information 1: <br />... ....... <br />Mike Currier OPR) 574-232-4388 <br />Contact Information 2: <br />Dave Rafinski OPI 574- 232 4388 <br />Additional Information: <br />Selge Construction was the General Contractor for this project <br />in 2019 working closely with JPR and the manufactures. The <br />project was not a guaranteed energy savings project but the <br />��..�.......... <br />owner was veil h�.widi the overall.P.TO.e..t:............� ��_.m._.......,.... <br />15 <br />