My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Johnson Melloh Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Johnson Melloh Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:20:50 PM
Creation date
8/28/2019 11:11:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Performance Contracting <br />Experience <br />At the end of the process, every mode of systems operation, all systems equipment, <br />components and zones, all backup systems, and every item in the control sequence <br />description are proven operational under all normal operational modes, including part <br />and full load, and under abnormal or emergency conditions. <br />The purposeofcommissioning to outline a formal program toensurethatthe performance <br />evaluation factors are properly implemented, measured and met in accordance with <br />the performance contract requirements. Each retrofit will be validated by a qualified <br />technical representative and be in accordance with the sequence of operations and <br />contract requirements. <br />Our commissioning approach/methodology is designed to achieve the following specific <br />objectives: <br />Ensure that applicable equipment and systems are installed properly and receive <br />complete operational checkout by the subcontractors <br />• Maintain compliance with all installation requirements <br />Verify and document proper performance of equipment and systems <br />Provide complete O&M documentation to the customer <br />• Ensure that the customer's operating personnel are properly trained <br />Representatives from the City of South Bend and Johnson Melloh Solutions will conduct a <br />final inspection toverify compliance tothe contract documents. Johnson Melloh Solutions <br />will prepare and submit closeout records and as -built documents to the respective <br />representatives. Commissioning all features of the new or upgraded equipment will be <br />conducted using the manufacturer's specifications, as well as the performance criteria <br />established for the specific project. Once commissioning is completed, Johnson Melloh <br />Solutions will seek the City of South Bend's final acceptance. <br />Our project managerwill close outthekeycomponentsofthe projectoncethe installation, <br />testing, commissioning and project acceptance for the entire scope of work have been <br />completed. Our project manager will compile project documents and acceptance of <br />systems along with: as -built drawings, operations and maintenance manuals, plans and <br />drawings, equipment and spare parts lists, software delivered and archived, inspection <br />reports, testing and commissioning reports, system turnover and acceptance reports, <br />non-conformance reports, certificates of completion, training records and certification <br />of customer training, change orders, final invoices, closed punch list, final waivers and <br />release of liens. This is a turnkey project with commissioning included as a built-in cost. <br />Benefits of Our Approach: <br />Reduced "hiccups" after construction - Since JMS will provide world class training <br />and commissioning, the building owner will see fewer problems arise once the <br />commissioning is complete <br />• Verification and validation of system design and performance <br />Clear expectations set and understood by both JMS and the City of South Bend <br />Working directly with facility staff during the commissioning process to provide <br />training and allowing open communication. <br />
The URL can be used to link to this page
Your browser does not support the video tag.