Laserfiche WebLink
ARCHITECTURE + PLANNING <br />Change Order Recommendation #006 <br />July 2, 2019 <br />To: <br />City of South Bend <br />Board of Public Works <br />Dan Jones, Project Inspector <br />227 W Jefferson Blvd <br />South Bend, IN 46628 <br />574-233-7531 <br />Project: <br />Fire Station #9 <br />2108 E Mishawaka Ave. <br />South Bend, IN 46615 <br />1. In response to RCO #009R1, change to provide and install for additional Locution <br />Alerting System components, rough -ins, and wiring. We recommend the additional costs <br />of $8,206. <br />2. In response to RCO #015111, change to relocate PV panel inverter to IT Closet with <br />additional rigid conduit and removal of computer and monitor. We recommend the <br />additional costs of $3,091. <br />3. In response to RCO #016, change to remove gypsum board soffits in Dining Room, add <br />one additional fan in the Captain's Quarters, and install misc. steel brick angle on East <br />elevation of Apparatus Bay. We recommend the additional costs of $2,725. <br />4. In response to RCO #017, change to relocate installed skylight curb in apparatus bay due <br />to relocated ductwork. We recommend the additional costs of $1,727. <br />5. In response to RCO #018, change to provide and install additional electrical sub -panel <br />and three-phase wiring to (6) garage door openers. We do not recommend the full <br />additional costto be born to the owner. We recommend one-half the additional costs of <br />$4,287.50. <br />6. In response to RCO #019, change to provide and install rigid insulation and plywood at <br />Apparatus Bay parapet in lieu of spray foam insulation. We recommend the additional <br />costs of $6,523. <br />