My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:30 PM
Creation date
8/15/2019 8:27:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARCHITECTURE + PLANNING <br />7. In response to RCO #020, change to provide replacement shower pans on second floor <br />and removal of interior signage not required. We recommend the combined deduct <br />value of ($2,007). <br />8. In response to RCO #021, change to provide maple butcher block countertop in Work <br />Bench Area in lieu of stainless steel. We recommend the value of No Change. <br />9. In response to RCO #022, change to provide and install U-Shape bollard for protection of <br />Apparatus Bay oil separator located near North Apparatus Bay drive, and boulders along <br />West property line alley. We recommend the additional costs of $7,917. <br />10. In response to RCO #023, credit for utilizing existing flag pole in lieu of new flag pole. We <br />recommend the deduct value of ($789). <br />11. In response to RCO #024, change to provide and install additional parking signs and <br />walk -off malts per the LEED reviewers' comments to satisfy LEED requirements. We <br />recommend the additional costs of $1,602. <br />12. In response to RCO #025, change to provide and install sidewall dryer vent in lieu of <br />venting through the roof, added casters to kitchen range, tree substitution credit, <br />gypsum board bulkhead at fitness room and cement board in Decon Room shower. We <br />recommend the additional costs of $2,204. <br />13• n respo' - C <br />o Northeast Aa RO #02phang ,,,to provide and install additip,n ,l-c,oncrete sidewalks, <br />rework Bt�rncet.-�We d nr�t reco`rai„us �ay,drive, ari�-dd�fir�ai,co ncrete work at alley <br />., mmend the additional costs of <br />14. In response to RCO #027, change to modify the three -compartment kitchen sink due to <br />conflict with window sills. We recommend the additional costs of $1,667. <br />Total Change Value Recommended: ADD $37,153.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.