My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:30 PM
Creation date
8/15/2019 8:27:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Number: 116-012 <br />DATE INITIATED: 7-16-19 <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Name: Fire Station #9 <br />BPW DATE: 8-13-19 <br />Change Order #: 6 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various project changes including: <br />Add for Locution components, rough -in, and wiring; Add to relocate PV panel inverter; Add to <br />remove soffits and add fan; Add to relocate skylight curb; Add to install additional electric sub <br />panel; Add to install rigid insulation at App Bay parapet; Deduct for replacement shower pans and <br />signage; Add to install bollard; Deduct to utilize existing flagpole; Add to install additional parking <br />signs and walk -off mats; Add to install sidewall venting and bulkheads; Add to modify kitchen sing. <br />Attachments: (List documents support change — required) <br />Price breakdown per various items. <br />Amount of B Increase / ❑ Decrease: $ 37,153.50 <br />Previously approved Change Order(s): $-7,951.00 <br />Current Percent of Change: 1.02 <br />New Total Amount: $ 3,681,702.50 <br />Total Percent of Change: 0.80 <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) <br />REVIEWED BY: <br />Toy Villa <br />Construction Manager (Print Name) <br />APPROVED BY: <br />Q L t Ci, .A C.Z4 p a 0 c. e 1 <br />Engineering Project Manager (Print Name) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) <br />Categories (Pick One): <br />8 Scope of Work <br />❑ Differing Site Conditions, Changed Conditions <br />❑ Conflicted Specifications and Drawings <br />❑ Failed Materials <br />❑ Error <br />❑ Omission <br />❑ Final Quantity Adjustment <br />o <br />(Signature) (Date) <br />(Signature) (Date) <br />_V, <br />(Signature) (Date) <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.