My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 6 - Fire Station No 9 Project No 116-012 - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:00:30 PM
Creation date
8/15/2019 8:27:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document G7 1rM <br />DAI <br />_2017 <br />Change Order <br />PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: <br />17398 - Fire Station Number 9 Contract For: General Construction Change Order Number: 006 <br />2108 Mishawaka Avenue Date: March 13, 2018 Date: July 3, 2019 <br />South Bend, IN 46615 <br />OWNER: (Name and address) <br />City of South Bend <br />Board of Public Works <br />227 West Jefferson Boulevard <br />South Bend, IN 4614 <br />ARCHITECT: (Name and address) <br />EPOCH Architecture + Planning <br />300 West Jefferson Boulevard <br />South Bend, IN 46601 <br />CONTRACTOR: (Name and address) <br />Ziolkowski Construction, Inc. <br />4050 Ralph Jones Drive <br />South Bend, IN 46628 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives) <br />Change Order Recommendation # 006 <br />Lines 1 - 14 <br />The original Contract Sum was <br />3,652,500.00 <br />The net change by previously authorized Change Orders <br />$ <br />-7,951.00 <br />The Contract Sum prior to this Change Order was <br />$ <br />44,5419.00 <br />3 t�3'7 <br />The Contract Sum will be increased by this Change Order in the amount of <br />$ <br />TT <br />153,50°w' 1, 01d0 -TAC. <br />The new Contract Sum including this Change Order will be <br />$ <br />_ 3,681 702.50w <br />The Contract Time will be unchanged by Zero (0) days. <br />The new date of Substantial Completion will be May 17, 2019 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />EPOCH Architecture <br />Ziolkowski Construction, Inc. City of South Bend <br />Board of Public Works <br />ARCHITE l'° °rrf r rrr :,� CONTRACTOR ql ir/ t name) OWNER (Firm name) <br />SI AT GNAT,IRE SIGNATURE UNQ of Pil- late P <br />Andrew Avara. PM <br />PRINTED A.ME AND TITLE <br />DATE' <br />Bill Favors, President & CFO <br />PRINTED NAME AND TITLE <br />Julv 3, 2019 <br />DATE <br />AIA Document G701 TM — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. tl'�UA'RINIIINGn "II "his <br />AIIA'a' IDocnuunnei nt: its (protected by UAu. Colpyu°Ugint (Law aund Unuternatlionall Treaties. U.Unnauuiffmrii:n:ad reproduction air distiributk nn ol':Ihiias AIIA"I Iftocuun ent, or <br />any Iprcairtionn of it, may re ullt lion severe OvliU and criinnunariil Ipenaalltiu"s, and willll be Ipirosec uted to the inaxlirn um extent possiblie under the (law. This <br />document was produced by AIA software at 09:30:04 ET on 07/03/2019 under Order No. 5092494214 which expires on 07/04/2020, and is not for resale. <br />User Notes: (3139ADMF) <br />
The URL can be used to link to this page
Your browser does not support the video tag.