My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:57:22 PM
Creation date
8/15/2019 8:25:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: <br />116-082C Project Name: Miami Basin improvements Change Order #: 3 <br />DATE INITIATED: 7/2/19 BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Repair 2-6" PVC Storm Lines ($1,975). Lower 2" Conduit ($1,035). <br />Attachments: (List documents support change — required) <br />Contractor Pricing. <br />... _........ <br />. <br />Amount ofeIncrease /❑Decrease: $3,010.00 <br />_.—._._..................._......._._._.._ Categories (Pick One): <br />Previously approved Change Order(s): $ 8,780.00 ❑ Scope of Work <br />® Differing Site Conditions, Changed Conditions <br />Current Percent of Change: '6 % ❑ Conflicted Specifications and Drawings <br />504 790 00 El Materials <br />New Total Amount: $......................:.......................... ❑ Error <br />❑ Omission <br />Total Percent of Change: 2.39 .. .......... % ❑ Final Quantity Adjustment <br />Funding Secured From; E7 _ ITITITIT " _.. <br />(filled out by PM) mmIT <br />RECOMMENDED BY: <br />Josh Ehmer 7/26/19 <br />Project Inspector (Print Name) (Sirgnatu (Date) <br />REVIEWED BY: <br />®`t <br />Constru=6BY" <br />eager (Print Name) (Signature) (Date) <br />APP't�: ,„,... <br />En i ring Project Managr (Print Name) (Signature) (Date) <br />APPRONED BY: <br />(SCit Engineer (Prin Name' o na e) <br />
The URL can be used to link to this page
Your browser does not support the video tag.