My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Miami Street Basin Drainage Improvements Project No 116-082C - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:57:22 PM
Creation date
8/15/2019 8:25:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a ar4i T �w a� <br />CITY OF SOUTH BEND, INDIANA <br />DEPARTMENT OF PUBLIC WORKS,�� <br />PROJECT CHANGE ORDER <br />DATE: 7/2/2019 <br />PROJECT NO: 116-082C <br />PROJECT NAME: MIAMI STREET BASIN DRAINAGE IMPROVEMENTS <br />CONTRACT DATE: 8/14/2018 <br />CHANGE ORDER NO: ._3 .. ._._._....__........_...�. .��_�........�_._ <br />SUBJECT OF CHANGE ORDER: PCR #3-Repair 2-6" PVC Storm Lines ($1,975). Lower 2" Conduit <br />$1,035 . <br />The original contract sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this Change Order, the project amount is <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />66tractor Signa care <br />Matthew D. Cain, President <br />—................... _...... <br />Printed Name and Title <br />HRP Construction„ Inc. <br />Company Name <br />5777 Cleveland Road <br />Address <br />South Bend, IN 46624 <br />City, State, Zip <br />$ 493,000.00 <br />$ 8,780.00 <br />$ 501,780.00 <br />X Increased <br />Decreased $ 3„010.00 JJ <br />$ 504,790.00 <br />0.60 % <br />_- 2.39 % <br />12/24/2018 ..... <br />_............_ ........... _e <br />145 days <br />0 days <br />5/18/2019 <br />hyAlrl CM'2 <br />•1ION <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />Approved Date: 1, <br />Gary A. Gilot, President <br />Genevi ve E. Miller, umber <br />ti <br />Elizabeth A. Maradik, Member <br />Theres 5orau, rn er <br />;u-r�taO"—SuIliva-- <br />n, Member <br />
The URL can be used to link to this page
Your browser does not support the video tag.