My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Bendix Theater Lift at Century Center Proj No 118-036C - Brown and Brown General Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Bendix Theater Lift at Century Center Proj No 118-036C - Brown and Brown General Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:14:16 AM
Creation date
5/29/2019 10:46:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'Browrt and <br />rown <br />`r" fw arm. �e'A <br />Item #3 Lintel change in size <br />Delete spec lintel ($740.00) <br />Add re -used lintel 515.00 <br />Item #4 No change <br />Item #5 Additional CMU because of missing piece <br />Subcontractor $670.00 <br />10% Oh/P 67.00 <br />Deduct $225.00 <br />Add $737.00 <br />3, Add for temporary wall required by Scott Add $231.00 <br />4. Add for brick exterior at ceiling Add 957,010 <br />Total add $9,550.77 <br />Because of all the changes in this project, please extend our contract by <br />fifteen (15) days. <br />Brown & Brown General Contractors, Inc. <br />Eric Brown <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.