My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Bendix Theater Lift at Century Center Proj No 118-036C - Brown and Brown General Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Bendix Theater Lift at Century Center Proj No 118-036C - Brown and Brown General Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:14:16 AM
Creation date
5/29/2019 10:46:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
....�.m......�....__.......�....�.....�,� SINGE 9939 .__,�.,m�. _..�.....- <br />� rown and � rown <br />124 S. ELKHART ST. <br />P.O. BOX 487 <br />WAKARUSA, INDIANA 46573.0487 <br />PHONE: (574) 862.2171 FAX: (574) 862.3930 <br />Greg McGowan <br />City of South Bend <br />1316 County -City Building <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601-1830 <br />Re Bendix Theater Lift <br />South Bend, IN <br />Greg: <br />May 20, 2019 <br />Here is a list of the extras to date as per Ed's summation - <br />1. Change the brick construction to ground -face block Add $3,660.00 <br />2. Changes requested as per Ed Kowalczyk's email dated 4/30/2019 <br />Item #1 New bulkhead area <br />Subcontractor $1,743.00 <br />Material 600.00 <br />Labor 2,072.00 <br />10% Oh/P 441.44 <br />Item #2 Change brick fill-in to drywall <br />Subcontractor ($1,380.00) <br />Material 160.00 <br />Labor 564.00 <br />Add $4,855.77 <br />Deduct $665.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.