My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Police Vehicle Decal Design and Application - Signature Graphics Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Police Vehicle Decal Design and Application - Signature Graphics Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:39:20 AM
Creation date
12/12/2018 1:19:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12 <br />-ield Support ani,,,.e. <br />installation <br />Signature Graphics has the most successful and extensive experience in planning, managing and <br />executing large and small national fleet branding projects in our industry. Signature Graphics has <br />developed and implemented a nationwide network of certified installation sub -contractors who are <br />qualified by Signature Graphics to meet and exceed workmanship, warrantability, accountability, <br />experience and expertise. <br />Signature Graphics employs a dedicated Installation Department, managing the field installation process <br />for efficiency, productivity and verifiable results. Field installation can present a myriad of challenges as <br />it relates to driver schedules, avoidance of downtime, weather, vehicle conditions and other factors that <br />can prohibit timely completion, but no one in the industry can match the track record, installer network, <br />and experience of Signature Graphics. <br />Field Labor Quotes <br />• Standard turn times for field labor quotes is three days from receipt of request. Field labor <br />quotes are based upon installation location, quantity of vehicles per trip, square footage of <br />material being removed and/or installed per vehicle, type of material being removed/installed <br />and inside facility availability. <br />• Exceptions to a three-day turn time will be communicated to all affected parties. <br />Field Labor Implementation <br />• Standard field labor completion for individual field installations, upon receipt of cost approval, <br />all necessary contact information and graphics availability is ten business days to two weeks. <br />o Upon receipt of approval, Signature Graphics' Installation Department Coordinator will <br />make an initial call to the location contact, introducing the project and gathering <br />necessary details about the installation. <br />o Signature Graphics' Installation Coordinator will manage the schedules of the <br />installation sub -contractor and the location, receiving confirmation from both parties of <br />an agreed -upon date, confirming graphics receipt, cleanliness of vehicle(s), and inside <br />space availability, if necessary. <br />o Signature Graphics' Installation Coordinator will confirm the appointment with the <br />location contact 24 hours prior to the scheduled installation date. <br />o Signature Graphics' Installation Coordinator will confirm the satisfactory complete of <br />the installation 24 hours after the scheduled installation date. <br />o Upon satisfactory completion, Signature Graphics will update the status as complete <br />and generate an invoice for payment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.