Laserfiche WebLink
CITY OF SOUTH BEND I OFFICE OF THE CLERK <br /> engineering project in the City, it is happening through us. Any time during the year there could <br /> be more than one hundred and fifty (150) projects underway. This (referencing a slide in the <br /> presentation) is what it looks like in 2019. We are going to be engaged in a variety of projects. <br /> Those projects include easy to see roadway and traffic projects, neighborhood engagement type <br /> projects such as traffic calming and lighting, facilities, Venues, Parks & Arts, the six (6) major <br /> projects and all the water projects. <br /> She continued,This next slide is in here every year as it gives you an idea of what our expenditures <br /> are like. You see a huge increase from 2018 to 2019 and it is very easily explainable. In the past, <br /> we would charge out salaries from the Engineering Department to the different departments in <br /> Public Works. So for instance,my salary would be partly charged to the General Fund but because <br /> we are doing water, waste water, sewers, streets and everything else, the other part of my salary <br /> was being paid for from the other divisions and they were actually in those budgets.Now, and you <br /> will see this shift in everyone's budgets in Public Works, all of those salaries will actually be <br /> shown as an expense and in revenue in the Engineering General Fund portion and will be allocated <br /> out to the various divisions. If you went back and did it the old way,we are actually down$71,000 <br /> for expenditures in 2019 compared to this ye of 2018. We are actually spending less but that is <br /> what it looks like. <br /> She went on, So I will now go through each of our funds that we use most. We allow the Streets <br /> Department to use a little bit of that money for streets supplies. Then we use that for many projects <br /> so you will see we have $5.7 million in expenditures planned from LRSA in 2019. Street <br /> maintenance and traffic signal maintenance is in every annual element of work.Under professional <br /> services, also MACOG, we have a partnership with them. Marquee maintenance is the same as <br /> what we did this ye . Something new you will see is outsourced street paving. So you see an <br /> additional $600,000 is LRSA for paving projects. Last year we used Motor Vehicle Highway to <br /> do that work. In 2018 we bid out$600,000 and were able to do eight(8) lane miles. <br /> She continued, Then we have a bunch of capital projects. Typically you're seeing traffic calming. <br /> In the past we budgeted, each year, a little more. This year we have proposed$250,000 and that is <br /> up from $100,000. The West Side Quiet Zone project is included here. This next element is the <br /> Century Center Dam repairs and I am sorry, it really should say South Bend Dam repairs. We <br /> know there are $30 million in capital improvement needs related to the South Bend Dam. This is <br /> the first (ls� time you'll see that in the budget as we try to begin and address those repairs. The <br /> Olive LPA Project, LID stands for land improvements and damages. So this is related to our Olive <br /> paving project. This is one(1) of our LPA projects so this is focused on the right of way expenses <br /> and the purchasing of permanent and temporary right-of-ways. The Community Crossings is a <br /> transfer that will go out to 265. 265 is the Community Crossings Fund. As a part of that program, <br /> the State requires each community to set up a special fund to spend out of for that grant. So the <br /> $600,000 is the portion the City pays that will be matching. We anticipate$600,000 from the State. <br /> Then the Bendix LPA project would be a transfer in from EDIT. So this is one (1) of the first(I") <br /> times I've been privy to asking for funds from EDIT for engineering projects. That is $2.5 million <br /> on the capital related to paving Bendix from Nimtz to Lincoln Way West. It is more than a paving <br /> project as it is called,what we call, a Complete Streets project. There is a road diet,new sidewalk. <br /> She went on, Special LOIT is a one (1) time distribution that we have been spending dollars out <br /> of. We plan to use around$65,000 this ye on a traffic signal study. That will focus on looking at <br /> our traffic management software. A majority of our signals are integrated into a traffic <br /> EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT <br /> 455 County-City Building 1227 W.Jefferson Bvld I South Bend,Indiana 466011 p 574.235.9221 If 574.235.9173 1 M 574.235.5567 lwww.southbendin.gov <br /> 7 <br />