Laserfiche WebLink
CITY OF SOUTH BEND I OFFICE OF THE CLERK <br /> management system so that they can talk to each other. It is a very antiquated system as it still runs <br /> on DOS, I believe. It needs some investment. This is the beginning of walking down that path. <br /> This will help us begin to get some technical assistance with a professional traffic engineer that <br /> will help us look at signal timings not just for vehicles but for pedestrians as well. This is that <br /> Local Road and Bridge Grant which is Fund #265, so this is where we anticipate receiving <br /> $600,000 from the State and partnering with our $600,000 match. Our focus this year will be on <br /> City-wide paving. This past year we did the Community Crossings grant and we used that to do <br /> work around Edison and Ironwood. So we are doing intersection improvements. Edison and <br /> Ironwood was one (1) of the oldest intersections and signal systems in South Bend, so, it needed <br /> that upgrade. That investment is highly focused on the intersection as well as doing the paving all <br /> the way to the Corby Ironwood Rockne intersection. Then we did some paving from SR-23 and <br /> some concrete replacement. We spent almost$1.5 million on that project. <br /> She continued, We anticipate spending $1.2 million out of Major Moves for the Corby Ironwood <br /> Rockne intersection improvements. This project is an LPA Project so that represents our cost share <br /> in this project. Again, it is one (1) of our oldest intersections as well. This will help improve that <br /> intersection by creating a better level of service. That will happen in 2019. We deal with a variety <br /> of elements in working with other teams and departments. We are heavily involved with VPA. <br /> There is certainly a need for that added Project Inspector. There is around $30 million in <br /> construction related work. On average, if you were to consider how much the cost is to hire a <br /> professional inspector,it is roughly eight to twelve percent(8% - 12%), so, if you said ten percent <br /> (10%) of$30 million, that is a $3 million investment just there. I feel that number would be less <br /> with another inspector. <br /> She went on, We also do a lot of work with DCI. Any of their TIF-related projects where they are <br /> partnering with developments and providing TIF dollars,we are involved in managing all of those <br /> engineering related projects. There are a lot of projects and a lot of dollars. Millions of dollars that <br /> are just related to the TIF. The West Side Quiet Zone is anticipated to have $120,000 worth of <br /> projects that primarily focus on the Norfolk Southern Corridor. This work in 2019 will be focused <br /> on the Canadian National and the NICTD. There are $350,000 in planned improvements for that. <br /> All those improvements are pavement markings, signal warning signs or mountable medians. That <br /> money will spent to help us begin the designation of the West Side Quiet Zone. I mentioned that <br /> last ye we budgeted$100,000 for neighborhood traffic calming. We are requesting$250,000 this <br /> year. We had a very successful project this year with the demonstration at Hudson and Riverside. <br /> We are planning to make small modifications to that this fall. It will then be taken out for the fall <br /> and winter plow seasons but then we will be working on a design for, hopefully, a permanent <br /> installation in 2019. We did some speed humps on College and Sunnymeade. We have gotten <br /> feedback on those designs and we look to improve that design. We are looking to do a project <br /> along Longfellow this ye . We are also working with residents in Walnut Grove to come up with <br /> some potential traffic calming units. We have a long list of need there so that $250,000 will help <br /> us take a bite out of that list. <br /> She continued, Light Up South Bend will produce eighty(80)lights. They will be in districts three <br /> (3) and six (6). Also some of the funds are going to fix some of the lighting along Riverside near <br /> Leaper Park. We have about twenty(20) lights there that will be worked on. We are working with <br /> residents to make sure we get the right temperature on those lights. We just quoted out a project <br /> for Angela Bridge. You should soon see some fixtures on the Angela Bridge. It already has conduit <br /> in place. There are those areas where it just is not that easy for the lighting situations.The electrical <br /> EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT <br /> 455 County-City Building I227W.Jefferson BvldI South Bend,Indiana 46601 p574.235.92211f574.235.9173 TTD574.235.55671www.southbendin.gov <br /> 8 <br />