Laserfiche WebLink
®CITY OF SOUTH BEND I OFFICE OF THE CLERK <br /> of the increase in our expenses, we do have enough in our cash balance that we can use. We have <br /> to think about 2020 and 2021 but this should help us with this , ear. <br /> He went on, The big highlight is the need for us to procure the two (2) trucks. We are seeing <br /> landfill costs increase. Our revenue is staying about the same but our costs do increase so we have <br /> a three percent(3%)increase in landfill costs,insurance numbers have gone up,truck maintenance <br /> cost seems to be going up and that is something we would like to control more. We are in the <br /> process of looking at some grants. We plan to apply for a grant to purchase the new trucks. There <br /> is no change in personnel.However,we are asking for a small more than two percent(2%)increase <br /> in our Solid Waste Director salary to bring it up to more of the standard for the industry. <br /> Committee Chair White paused the presentation and opened the floor to questions from Committee <br /> and Council Members. <br /> Committeemember Williams-Preston asked, What is the percentage of the increase of the <br /> director's salary? <br /> Mr. Kain replied, Six percent(6%). <br /> Mr. Horvath stated, I will move onto utilities but before I do, I would like to give a shout out to <br /> Solid Waste. We've had some transition as of late and we had a number of vacancies in some of <br /> our positions. Kelly Smith first(1S) came over from wastewater to help us out and we've kept her <br /> on full-time as a director and also LaMonte Taylor. And Sean Ward has also done things outside <br /> of his duties. <br /> Mr. Horvath continued, Utilities I will go through quickly. Basically, water and wastewater, we <br /> provide safe drinking water out of their tap. We then take it back to the wastewater plant and clean <br /> it before we discharge it back into the river. We have nine (9) well fields and five hundred eighty <br /> (580) miles of water main, seven hundred (700) miles of collection system pipe and one (1) <br /> wastewater treatment plant. Some of the accomplishments include doing a lot of work on lead. We <br /> are very fortunate to have non-aggressive water so it doesn't leach lead out of the pipes of homes. <br /> At the same time, no level of lead is safe and so we've done a number of things to help with <br /> outreach to make sure people understand that it is a real concern. There are ways to minimize those <br /> exposures and there are brochures that went out to every one (1) of our customers. We also put <br /> some stuff in schools to try and do education there. Then there is a valve turning program we <br /> started for the first (1St) time. The reason that is important is that we have a break or some issue <br /> where we have to isolate areas, we have to use the valves to do that. And if we don't have those <br /> working, after a number of years they rest, and then you might be closing down a whole section <br /> of the City. That is an important program we are doing now. <br /> He went on, To go over a little bit of the funding, you can see (referencing a slide in the <br /> presentation) that in terms of revenue, we appreciate the Council helping with the rate increase <br /> that is making a significant difference in our ability to actually do capital improvements in the first <br /> (1St) time in a very long time. You can see that we are projecting from 2018 to 2019 that we will <br /> have significantly more dollars available to put into capital and that is about$3.7 million. You can <br /> see that on the expense side, too, going up from $18 million to $22.3 million and that is largely <br /> attributed to the capital projects which you can see here. We were doing very little capital in 2016 <br /> but have been ramping it up in the last couple of years and really getting some of these major needs <br /> EXCELLENCE I ACCOUNTABILITY ( INNOVATION I INCLUSION I EMPOWERMENT <br /> 455 County-City Building 1 227 W.Jefferson Bvld I South Bend,Indiana 466011 p 574.235.9221 If 574.235.9173 TTD 574.235.5567 1 www.southbendin.gov <br /> 17 <br />