Laserfiche WebLink
®CITY OF SOUTH BEND I OFFICE OF THE CLERK <br /> If we use this fee, it will generate enough money to meet the $1.2 million in needs that we've <br /> outlined in the budget. <br /> He continued,That nowhere meets the annual need that we have on capital,let alone the operations <br /> and maintenance. So were weren't trying to fully fund the stormwater utility needs because we felt <br /> like that would not be possible. It just made sense to at least start moving the needle in terms of <br /> trying to work on these assets and we take care of some of the drainage issues we have. There is <br /> nothing more frustrating for us,as problem solvers,to not be able to solve some of this just because <br /> we don't have the money. There are always going to be capacity issues, as well, in terms of having <br /> time to get to stuff. But, in this case, a lot of these storm things, we don't have any funding to <br /> actually attack them so it puts us in a really tough position. We are constantly trying to find ways <br /> to do it without having a funding source. We will be having further dialogue with the Council. I <br /> appreciate your understanding of this being at the preliminary proposal phase. We understand there <br /> needs to be considerable dialogue and community involvement throughout this whole process. We <br /> want to make sure we built this into the budget process so everyone has full disclosure of what that <br /> is going to be. <br /> Mr. Kain stated, Moving onto Streets and Sewers, here (referencing a slide in the presentation) is <br /> the organizational chart. There really are three (3) maintenance divisions. There is the Street <br /> Division, led by Pete Kaminski, the Sewer Division, led by Sean Ward, and the Traffic and <br /> Lighting Division led by Ed Gleckler. We've had a busy year so far but have had some <br /> accomplishments. We ended the season with some additional material. We got a pretty good rate <br /> on salt last year in 2018 so we are able to use that same rate to get ready for the upcoming winter <br /> season. We are currently rating our streets annually. We send crews out to rate the condition of <br /> streets using the PAZER System. That is a rating system from one (1) to ten (10), and that allows <br /> us to shortlist the streets that have to be paved that year and the following years. To date,we have <br /> paved about eight (8) lane miles. Our goal is eighteen (18) to twenty (20) miles a year. In the <br /> Traffic and Lighting Office, we've been busy with a number of things. We are focused on the <br /> maintenance of many of our signals and lights. We have also upgraded our lights to LED and that <br /> is about seventy(70) lights that have been upgraded. A big part of what Traffic and Lighting does <br /> is provide event support. So to date,about seventy-three(73)events have been supported and those <br /> are anywhere from small neighborhood block parties to large races and regional events. Our crews <br /> will work with South Bend Police to block streets and provide support. <br /> He continued, Our Sewers Office has been busy with maintaining large sewer lines. To date, we <br /> have cleaned and inspected about twenty(20)miles of lines. We've had some sewer back up issues <br /> this year as we have had some heavy rainfall. We have about sixty-four (64) backups caused by <br /> heavy rain. We have been very busy with cleaning inlets. About six hundred and twenty-eight <br /> (628) inlets were cleaned,just as a result of the February 2018 flooding. A large number of hours <br /> were spent in the areas that received a large amount of flooding. We've had a number of sewer <br /> mainline repairs. Eleven(11)is about average for the year but we are also seeing sinkholes appear <br /> and that is an issue we are constantly facing. That is, again, a reflection of the aging infrastructure <br /> we have in the community. For curbs and sidewalks, we've completed a good portion so far. We <br /> have a lot to complete. Our goal on the City crew side is roughly about 3,000 feet of curb and <br /> about 3,000 feet of sidewalk. We are making progress there. <br /> He went on, The ReLeaf Operation has been relying on technology to better map the leaf <br /> conditions we see throughout the City. We've deployed mobile devices to many of our crews in <br /> EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT <br /> 455 County-City Building 1 227 W.Jefferson Bvld South Bend,Indiana 466011 p 574.235.9221 If 574.235.9173 TTD 574.235.55671www.southbendin.gov <br /> 14 <br />